Jaga STRADA Скачать руководство пользователя страница 4

4

|

Thank you for choosing our STRADA Low-H

2

radiator. If installed and maintained correctly, it will 
give you many years of efficient and safe heating.

2.  COMPONENT PARTS

3.  TOOLS REQUIRED

Extended Air Vent

Heating Element

Casing

Tape Measure

Spanner 

(10, 22 and 30mm)

Personal Protection Equipment 

(minimum requirement)

Gloves

Safety Glasses

Fixing Pack

Drill

8mm Masonry Drill Bit

Hammer

Spirit Level

Knife

Screwdriver (flat)

1. INTRODUCTION

The installation of STRADA Low-H

2

radiators should be in accordance with 

these installation instructions and the work 

completed by a competent person.

Left Hand Bracket

Right Hand Bracket

For lengths 1400mm 
to 2200mm, a third 
bracket is supplied.

For lengths 2400mm 
and over, a fourth 
bracket is supplied.

Содержание STRADA

Страница 1: ...STRADA INSTALLATION AND MAINTENANCE INSTRUCTIONS LOW H2O RADIATOR FOR HEATING ONLY Tested in accordance with EN442...

Страница 2: ...2...

Страница 3: ...4 2 COMPONENT PARTS 4 3 TOOLS REQUIRED 4 4 INSTALLATION 5 5 FITTING THE CASING 8 6 REMOVING THE GRILLE 9 7 OPTIONAL EXTRAS 10 8 FURTHER GUIDANCE 11 9 MAINTENANCE 12 10 GUARANTEE 12 11 FAULT FINDING 1...

Страница 4: ...nal Protection Equipment minimum requirement Gloves Safety Glasses Fixing Pack Drill 8mm Masonry Drill Bit Hammer Spirit Level Knife Screwdriver flat 1 INTRODUCTION The installation of STRADA Low H2 O...

Страница 5: ...connection for the air vent is on the top of the heating element Minimum clearance from floor to underside of casing for STRADA equals h dimension The supplied fixings are suitable for solid wall cons...

Страница 6: ...e air vent to the top 1 8th connection and moderately tighten 09 Fix the element assembly to the wall with the fixings provided Depending on the wall construction other fixings may be required Insert...

Страница 7: ...0 18 10 11 53 29 15 16 78 53 20 21 103 79 13 The blanking plug can now be fitted to the unused connection If incorrectly connected the heating performance will be reduced and the thermostatic radiator...

Страница 8: ...ert the first half moon decorative clip Locate the grille into front panel lower down into position and fix back bar CLICK 1 2 3 4 CLICK 02 Hook casing onto bottom of bracket Lift casing up and over t...

Страница 9: ...tapping a wedge in to the back bar with a rubber mallet do not use a screwdriver 02 Remove the back bar 03 Remove the top grille 04 Replace top grille 05 Replace the back bar 06 Secure the back bar b...

Страница 10: ...10 Arthritic Aid 01 Simply push over the end of TRV NOTE Arthritic aid only suitable for use with Jaga White JW TRV head 7 OPTIONAL EXTRAS...

Страница 11: ...ion and limescale prevention The water should be checked annually Failure to maintain good water quality will result in the product guarantee being null and void Balancing Please balance the heating s...

Страница 12: ...tant coating It is recommended that the heat exchanger is checked annually for the accumulation of dust hair and fibre Simply remove the thermostatic head and the casing and brush or vacuum the heat e...

Страница 13: ...heating system ensuring adequate flow to each radiator and even heat distribution to each room Air in the heating system Bleed air from radiator using the extended air vent Lack of adequate airflow En...

Страница 14: ...ompany reserves the right to charge the Buyer for replacement components and associated costs for claims falling outside the guarantee terms 5 Correct application and maintenance is also essential to...

Страница 15: ...15 NOTES I Check out installation video on Jaga s website or youtube 2 Please phone 0I53I 63I 533 for help or assistance...

Страница 16: ...44 1531 631 533 jaga jaga co uk www jaga co uk JAGA UK Jaga House Orchard Business Park Bromyard Road Ledbury Herefordshire HR8 1LG STRADAINST1222 JAGA UK...

Отзывы: