Jafar 8890 Скачать руководство пользователя страница 7

 

OPERATION AND MAINTENANCE MANUAL 

01-2016

 

7

 

3.4 TRANSPORT 

 

Transport the couplings on sheltered vehicles. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
Use slings sized from DN80 to DN250 for transport and installation of couplings.  
 
 
4. ASSEMBLY AND INSTALLATION 
 

4.1. INSTALLATION GUIDELINES 

 

Inspection couplings with hydrant valves type 8890 can be installed in above-ground pipelines in horizontal 

orientation, configured as shown in the following figure. The couplings are suitable for joining with the flanged 
ends  of  pipelines  with  the  size  equal  to  that  of  the  valve  flanges.  Note  that  the  system  must  not  expose  the 
coupling to bending or tensile stress from loading with the unsupported pipeline sections. It is recommended to 
perform  installation  works  considering  pipeline  compensation  due  to  temperature  and  pressure.  A  coupling 
assembled and delivered by the manufacturer is ready for installation in the system. Disassembly of the coupling 
components without proper care may result in loss of tightness. 
 
 

4.2 INSTALLATION INSTRUCTIONS 

 

Before installing the fittings, check the technical and commercial documentation, i.e. application for media 

and  operation  parameters  of  the  pipeline,  in  which  they  are  to  be  installed.  Any  change  in  the  operating 
conditions must be consulted with the fitting's manufacturer beforehand. 

Before attempting to assemble the valve, remove the main bore plugs, check the inner surfaces of the valve 

and thoroughly flush with water, if necessary. 

 

Note! If the product is damaged mechanically, do not install it in the pipeline. 
 

The assembly method is shown in the following figure: 

Содержание 8890

Страница 1: ...by President of Factory JAFAR S A Failure to comply with the guidelines and instructions in this Operation and Maintenance Manual releases the manufacturer from all obligations liability and guarantee...

Страница 2: ...ESCRIPTION 3 2 2 MATERIALS 4 2 3 DIMENSIONS 4 2 4 STANDARDS 5 2 5 ORDERING REGULATIONS 5 2 6 MANUFACTURE AND ACCEPTANCE 6 2 7 MARKINGS 6 3 PROTECTION STORAGE TRANSPORT 6 3 1 PROTECTIVE COATINGS 6 3 2...

Страница 3: ...table water for industrial water at temperatures from 1 C to 70 C Available diameters DN50 DN250 for flanged versions Installation length PN EN 558 2012 Maximum medium flow rate 4m s Max working press...

Страница 4: ...2012 2 Cover EN GJL 250 EN GJS 400 15 PN EN1561 2012 PN EN1563 2012 3 Cleanout opening CuZn39Pb1Al B PN EN1982 2010 4 Cleanout opening seal Technical fibre 5 Bonnet gasket EPDM NBR PN EN1629 2005 6 B...

Страница 5: ...12 Founding Spheroidal graphite cast irons PN EN 10088 1 2014 Stainless steels List of stainless steels PN EN 1706 2011 Aluminium and aluminium alloys Foundings Chemical composition and mechanical pro...

Страница 6: ...f the body chamber The marking contains the following data nominal diameter nominal pressure type of body material manufacturer trade mark an arrow showing flow direction The location on the valve spe...

Страница 7: ...to perform installation works considering pipeline compensation due to temperature and pressure A coupling assembled and delivered by the manufacturer is ready for installation in the system Disassem...

Страница 8: ...lowable scope of work Exceeding the operating limits of the fitting may result in damage that will not be covered by the suretyship granted by the manufacturer 4 4 OH S REGULATIONS The inspection coup...

Отзывы: