H 9 6 5 6 0 0 A
Trim for Bath Shower with Diverter
By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the
HOT LIMIT SAFETY STOP
(1)
reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP
(1)
.
15
13
11
97
53
10
15
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
4
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
Turn CARTRIDGE STEM
(2)
to the OFF position (coldest setting) before making adjustment to HOT
LIMIT STOP
(1)
. Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP
(1).
Pull
forward and rotate counterclockwise one number to limit hot water temperature.
Use ARROW
(3)
on CARTRIDGE
(4)
and NUMBERS
(5)
on HOT LIMIT STOP
(1)
for indication.
1
5
1
5
4 4
3
3
2
2
ADJUST HOT LIMIT STOP (MUST BE DONE PRIOR TO TRIM INSTALLATION)
5
BACK TO BACK INSTALLATION
(SEE ILLUSTRATION STEP 7 FOR REFERENCE)
6
TEST INSTALLED FAUCET
Remove Handle and Trim from Valve. See
step 3 for reference.
Remove PRESSURE BALANCE UNIT
(5)
. Rotate
PRESSURE BALANCE UNIT
(5)
180˚ so that the inlets
face up and the large outlet port faces down.
Push PRESSURE BALANCE UNIT
(5)
in casting make
sure inlets line up with holes in bottom of casting. Top
flange should butt up against top of casting.
Reassemble FIXATION RING
(4)
and CARTRIDGE
(1)
.
Turn VALVE "off".
With HANDLE in "off" position, turn on water supplies
and check all connections for leaks.
Operate HANDLE and flush water lines thoroughly. Pull
DIVERTER and check SHOWER for proper operation.
Check SPOUT and SHOWER connections for leaks.
5
6
3
INSTALL TRIM
Figure 1.
Mount ESCUTCHEON HOLDER
(1)
and gasket to valve body with SCREWS
(2)
.
Mount ESCUTCHEON SUPPORT
(3)
to
ESCUTCHEON HOLDER
(1)
with SCREWS
(4)
.
Figure 1.
Figure 2.
5
6
7
1
3
4
2
Figure 2.
Align PINS
(5)
on back side of
ESCUTCHEON
(6)
with the FOUR HOLES
(7)
in ESCUTCHEON SUPPORT
(3)
. Press
ESCUTCHEON
(6)
flush against finished wall.
3
PIPE
PLUG
PIPE
CAP
1
4
5
6
3
Thread DIVERTER KNOB
(1)
onto diverter stem.
Install HANDLE ADAPTER
(2)
onto VALVE STEM
(3)
and secure with
SCREW
(4)
.
Install end of CROSS HANDLE
(5)
into HANDLE ESCUTCHEON
(6)
.
Holding the CROSS HANDLE
(5)
together with HANDLE ESCUTCHEON
(6)
thread the HANDLE ESCUTCHEON
(6)
onto the HANDLE ADAPTER
(2)
until the handle assembly is tight.
Remove pipe plug from shower and pipe cap tub filler pipe.
Install SHOWER ESCUTCHEON
(7)
onto SHOWER ARM
(8)
. Apply
sealant or Teflon tape to threads on both ends of SHOWER ARM
(8)
and thread longer leg of SHOWER ARM
(8)
into shower elbow.
Thread SHOWER HEAD
(9)
onto SHOWER ARM
(8)
.
9
8
7
2
CAUTION: Protect finish
on TUB SPOUT, SHOWER
HEAD and ARM when
installing.
Figure 3.
Figure 3.
10
1/2" HEX
WRENCH
APPLY
SEALANT
11
12
To install TUB FILLER SPOUT
(10)
first remove SET SCREW
(11)
and pull SPOUT ADAPTER
(12)
from back of spout.
Apply sealant to pipe nipple. With a 1/2" hex
wrench thread SPOUT ADAPTER
(12)
onto
pipe nipple. End of SPOUT ADAPTER
(12)
should extend 1-1/2" from finished
wall Push TUB FILLER SPOUT
(10)
onto SPOUT ADAPTER
(12)
flush
against finished wall. Align spout
and tighten SET SCREW
(11)
to secure TUB FILLER
SPOUT
(10)
to SPOUT
ADAPTER
(12)
.