FINISHED WALL
BOTTOM OF
TUB
TOP OF
TUB RIM
22" OPTIONAL
7-7/8" D.
GREASE
O-RING
6
7
3
11
13
12
14
1
10
5
2
4
8
9
1 0 9 7 2 1
1 0 9 7 2 1
Plumbers' Putty or Caulking
Adjustable Wrench
Teflon Tape
Phillips Screwdriver
Channel Locks
TOOLS REQUIRED
Tubing Cutter
Regular Screwdriver
"SEE ILLUSTRATION"
To assure proper positioning in relation to all,
note roughing-in dimensions.
ROUGHING-IN DIMENSIONS
THREADED
INLETS (STOPS)
INLETS
5-1/2"
(140 mm)
OUTLETS 1/2" NPT
5-3/4"
(146 mm)
1-3/4"
(44 mm)
SHW
TUB
1
By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the
HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1).
15
13
11
97
531
0
15
1
3
1
1
9
7
5
3
1
15
1
3
1
1
9
7
5
3
1
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT
LIMIT STOP (1). Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1). Pull
forward and rotate counterclockwise one number to limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4) and NUMBERS (5) on HOT LIMIT STOP (1)
for indication.
1
5
1
5
4
4
3
3
2
2
3
INSTALL TRIM
CAUTION: Protect finish on SHOWER ARM,
SHOWER HEAD and TUB SPOUT when installing.
2
INSTALL DIVERTER
After finished tiling the wall, remove PLASTER
GUARD (1). Remove two screws that secure the
DIVERTER LID (2) and remove Lid. Inspect the inside
surface of diverter port. Diverter port must be free of
any dirt. Clean if necessary.
Install DIVERTER (3) with SCREWS (4) removed from
DIVERTER LID (2).
Operate DIVERTER (3). DIVERTER (3) should slide in
and out smoothly.
Push on DIVERTER COVER (5).
1
2
4
5
3
DIVERTER
PORT
ADJUST HOT LIMIT STOP
5
BACK TO BACK INSTALLATION
(SEE ILLUSTRATION STEP 6 FOR REFERENCE)
6
TEST INSTALLED FAUCET
Remove Handle and Trim from Valve. See
step 3 for reference.
Remove PRESSURE BALANCE UNIT (5). Rotate
PRESSURE BALANCE UNIT (5) 180˚ so that the inlets
face up and the large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make
sure inlets line up with holes in bottom of casting. Top
flange should butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
Turn VALVE "off".
With HANDLE in "off" position, turn on water supplies
and check all connections for leaks.
Operate HANDLE and flush water lines thoroughly. Pull
DIVERTER and check SHOWER for proper operation.
Check SPOUT and SHOWER connections for leaks.
6
Push CAP (1) onto VALVE CARTRIDGE (2).
Mount ESCUTCHEON HOLDER (3) with gasket and the ESCUTCHEON
(4) to valve body and secure with SCREWS (5).
Push the COVER (6) as shown over the CAP (1) and align prongs on COVER (6)
with screw holes in ESCUTCHEON (4).
Important! Make sure COVER (6) snaps over the SCREWS (5).
Push ADAPTER (7 ) over CARTRIDGE STEM (8).
Push ESCUTCHEON (9) onto ADAPTER (7).
Mount CROSS HANDLE (10) or LEVER HANDLE (11) and secure with
WASHER and SCREW (12).
Cover with CAP (13).
Thread DIVERTER KNOB (14) onto diverter stem.
4