background image

FINISHED WALL

BOTTOM OF

TUB

 

TOP OF

TUB RIM

 

22" OPTIONAL

7-7/8" D.

GREASE

O-RING

6

7

3

11

13

12

14

1

10

5

2

4

8

9

1 0 9 7 2 1

1 0 9 7 2 1

Plumbers' Putty or Caulking

Adjustable Wrench

Teflon Tape

Phillips Screwdriver

Channel Locks

TOOLS REQUIRED

Tubing Cutter

Regular Screwdriver

"SEE ILLUSTRATION"

To assure proper positioning in relation to all,

note roughing-in dimensions.   

ROUGHING-IN DIMENSIONS

THREADED

INLETS (STOPS)

INLETS

5-1/2"

(140 mm)

OUTLETS 1/2" NPT

5-3/4"

(146 mm)

1-3/4"

(44 mm)

SHW

TUB

1

By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the

HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding. To set the maximum hot water

temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1).

15

13

11

97

531

0

15

1

3

1

1

9

7

5

3

1

15

1

3

1

1

9

7

5

3

1

COLDER

(Larger Numbers)

0 1 3 5 7 9 11 13 15

HOTTER

(Smaller Numbers)

0 1 3 5 7 9 11 13 15

Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT

LIMIT STOP (1). Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1). Pull

forward and rotate counterclockwise one number to limit hot water temperature.

Use ARROW (3) on CARTRIDGE (4) and NUMBERS (5) on HOT LIMIT STOP (1)

for indication.

1

5

1

5

4

4

3

3

2

2

3

INSTALL TRIM

CAUTION: Protect finish on SHOWER ARM,

SHOWER HEAD and TUB SPOUT when installing.

2

INSTALL DIVERTER

After finished tiling the wall, remove PLASTER

GUARD (1). Remove two screws that secure the

DIVERTER LID (2) and remove Lid. Inspect the inside

surface of diverter port. Diverter port must be free of

any dirt. Clean if necessary.

Install DIVERTER (3) with SCREWS (4) removed from

DIVERTER LID (2).

Operate DIVERTER (3). DIVERTER (3) should slide in

and out smoothly.

Push on DIVERTER COVER (5).

1

2

4

5

3

DIVERTER

PORT

ADJUST HOT LIMIT STOP

5

BACK TO BACK INSTALLATION

(SEE ILLUSTRATION STEP 6 FOR REFERENCE)

6

TEST INSTALLED FAUCET

Remove Handle and Trim from Valve. See

step 3 for reference.

Remove PRESSURE BALANCE UNIT (5). Rotate

PRESSURE BALANCE UNIT (5) 180˚ so that the inlets

face up and the large outlet port faces down.

Push PRESSURE BALANCE UNIT (5) in casting make

sure inlets line up with holes in bottom of casting. Top

flange should butt up against top of casting.

Reassemble FIXATION RING (4) and CARTRIDGE (1).

Turn VALVE "off".
With HANDLE in "off" position, turn on water supplies

and check all connections for leaks.
Operate HANDLE and flush water lines thoroughly. Pull

DIVERTER and check SHOWER for proper operation.

Check SPOUT and SHOWER connections for leaks.

6

Push CAP (1) onto VALVE CARTRIDGE (2).  

Mount ESCUTCHEON HOLDER (3) with gasket and the ESCUTCHEON

(4) to valve body and secure with SCREWS (5).

Push the COVER (6) as shown over the CAP (1) and align prongs on COVER (6)

with screw holes in ESCUTCHEON (4).

Important! Make sure COVER (6) snaps over the SCREWS (5).

Push ADAPTER (7  ) over CARTRIDGE STEM (8).

Push ESCUTCHEON (9) onto ADAPTER (7).

Mount CROSS HANDLE (10) or LEVER HANDLE (11) and secure with 

WASHER and SCREW (12).

Cover with CAP (13).

Thread DIVERTER KNOB (14) onto diverter stem.

4

Отзывы: