JBE-P2L1 Panel Manual V1.2 EN
Page 8
Release Date: January 5, 2021
Rev 01
4.2.3 Assembly of JBE-PRT (Draco Printer)
1.
While the panel is
unpowered, open the fire panel’s cabinet using the provided key.
2.
Remove the covering plate in the left side of the cabinet’s bottom.
3.
Insert the 2 M6 screws provided with the Draco printer into the matching holes of the main panel
cabinet’s bottom.
4.
Place the Draco printer box below the main panel’s cabinet and use the 2 protruding screws to align
the 2 housings.
5.
Use the 2x provided nuts to fasten the printer to the panel’s main housing. Tighten firmly.
6.
Route the provided flat ribbon cable through to the opening between the panel and the printer.
7.
Connect the flat ribbon cable to connector J3 in the panel’s display board (PCB JBE-P2L1 DP) and
to the printer.
8.
Connect the provided earthing cable from the panel’s earthing stud to the printer’s earthing stud.
Tighten the M3 nuts firmly
4.2.4 Assembly of JBE-BAT (Draco battery box)
Note that the JBE-
BAT battery box can be assembled either directly under the panel’s main cabinet or under
a panel which already has a JBE-PRT module assembled. In both cases, the installation procedure is the
same.
1.
While the panel is unpowered, open the fire panel’s cabinet using the provided key.
2.
Remove the knockout in the center of panel cabinet’s base.
3.
Place the Draco battery box below the main panel’s cabinet (or below the printer module, if it has
been installed) and use the 2 provided M6 screws to align the housings.
4.
Use the 2x provided nuts to fasten the battery. Tighten firmly.
5.
Using a PZ2 screwdriver, loosen the “battery” terminal screws in the power supply unit to remove
the original battery cables.
6.
Replace the original “Faston” battery cables with the “M5 ring” battery cables provided with the
battery box. Respect polarity (red
► “+” ; black ► “-“). Tighten the PSU screws firmly
7.
Remove the original temperature sensor by pulli
ng it gently off the “Temp sensor” connector in the
PSU. Replace it by the longer temperature sensor provided with the JBE-BAT.
8.
Route the newly installed battery cables and temperature sensor through the knockout in the center
of the panel’s base down to the battery compartment.
9.
Connect the provided earthing cable from the earthing stud in the battery box to the earthing stud in
the cabinet above. Tighten the M3 nuts firmly.