7. Locate the bottom rail and the fixed panel. Lay a bead
of sealant on the bottom of the fixed panel. Secure the
bottom rail to the fixed panel. (See Illustration 12.) Drill
a 3/32" diameter hole into the bottom rail at about 15
°
.
Drill only through the first aluminum thickness. (See
Illustration 13.) Secure the front of the fixed panel to
the bottom rail. (See Illustration 14.) Clean off excess
sealant.
15
15
°
ILLUSTRATION 14
ILLUSTRATION 12
ILLUSTRATION 13
H8
15
°
1/8"
IMPORTANT:
MUST DRILL AT 15
°
ANGLE TO AVOID
DRILLING THROUGH
DOOR GUIDE AREA.
IMPORTANT:
MUST DRILL AT 15
°
ANGLE TO AVOID
DRILLING THROUGH
SIDE OF RAIL.
M3.5X9.5MM
STAINLESS STEEL
SCREW
QTY.-1
LOCATED IN HARDWARE KIT
LOCATED IN HARDWARE KIT
FIXED PANEL TO BOTTOM RAIL
DRILLING FIXED PANEL
DRILLING FIXED PANEL
DOOR GUIDE
AREA
M4.2X19MM
STAINLESS STEEL
SCREW
QTY.-2
H8
H9
H9
FIXED PANEL
BOTTOM RAIL
LAY A 1/4" BEAD OF
SEALANT UNDER THE
FIXED PANEL
TWO
SCREWS
Содержание J-SHOWER TOWERTM
Страница 1: ...WHIRLPOOL BATH R INSTALLATION AND OPERATING MANUAL J SHOWER TOWER ENCLOSURE Siena Merano ...
Страница 2: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......