14
PLACING TOWER
ILLUSTRATION 11
5. Dry fit tower pins into holes to check hole location. Apply sealant around the three tower wall holes on the
bath and around the perimeter where the tower will set. (See Illustration 11.)
6. Place the tower pins in the holes and push the tower down firmly. The tower will stand temporarily on its own.
Clean off excess sealant.
Содержание J-SHOWER TOWER ENCLOSURE-Siena
Страница 1: ...WHIRLPOOL BATH R INSTALLATION AND OPERATING MANUAL J SHOWER TOWER ENCLOSURE Siena Merano...
Страница 2: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......