
J-Dream Owner’s Manual
Rough-in Corner (Left Hand)
WASHING MACHINE
OUTLET BOX
Connect #8 gauge (10 mm
2
) minimum solid copper
bond wire to house electrical panel or approved local
ground. An approved ground may be an 8 foot long
ground rod (3 meter long earth rod), a plate electrode,
or other acceptable bond. Check your local building
code for reqiurements.
Electrical outlet 240V, 15A
rating to be on a GFCI-
protected circuit.
HOSE BIBB (2)
TWO (2) 1/2 " HOT & COLD
WATER SUPPLY LINES
IMPORTANT: This illustration shows the
installed position of the waste stubout when
connected to the shower drain. If the stubout
is installed before the shower unit, leave
enough flex in the waste line to allow the end
of the stubout to be blocked temporarily (see
page 11) in a position under flush on the floor
surface. This will allow the shower unit to slide
across the floor into position without having to
lift it.
IMPORTANT: The shower drain is designed
to connect to a 2 inch (50 mm) ABS or PVC (as
approved by local codes/standards) waste
stubout.
The end of the 2 inch (50 mm) waste stubout
must be located to these dimensions within 1/4
inch (6 mm).
Stubout for steam tank drain down
line should be minimum 1/2"
copper tubing. Provide 3/4" male
pipe thread fitting on end of copper
drain line.
This drain line must be provided for
the steam tank drain to site drain
as required by local
codes/standards.
36"
16"
FINISHED
WALLS
2" WASTE
STUBOUT
11-5/8"
FINISHED
WALL
SURFACE
FINISHED FLOOR
MATERIAL
60"
FINISHED
MINIMUM
40"
55"
3"
3"
13"
18"
16-3/8"
6