
TOWERS AND DOORS INSTALLATION
FINISH WALL
EDGE
OF BASE
GLASS SIDE
PANEL MOUNTED
PARALLEL TO
EDGE OF BASE
WALL POST
TAPE (3)
SCREWS (3)
STEP 15 (2 WALL ONLY)
Position the fixed glass wall post so that the glass side
panel will be parallel with the outside edge of the base.
The fixed glass wall post position may vary slightly due
to the anchored location of the water tower.
STEP 16 (2 WALL ONLY)
Level the post in its proper position and mark where
screw holes are to be drilled. Drill 3/16" holes and secure
with wall anchors and screws provided. Apply tape
(provided) firmly over screw heads.
STEP 17 (2 WALL ONLY)
Slide fixed glass panel all the way into wall post.
14
Jacuzzi Whirlpool Bath
©
BZ00000 03/05
Содержание BZ00000
Страница 25: ...23 Jacuzzi Whirlpool Bath BZ00000 03 05...