JACLO 349 Series Скачать руководство пользователя страница 3

jaclo

 

industries 

 |  129 Dermody Street   Cranford, NJ 07016

p

 908.653.4433 | 800.852.3906   

f

 908.653.1717 | 800.852.4133

   

REVISED 4.27.2018

JACLO.COM

   |   PG 3

FIG. 5

10. 

Slide the coupling nuts and gaskets onto the overflow ell and 

drain ell.

11. 

Fit the overflow ell into the tee.

12. Then slide the tee onto the drain ell. Hand tighten the       

coupling nuts to the tee. 

NOTE: DO NOT TIGHTEN WITH A WRENCH AT THIS TIME

13. Some applications may require the drain ell tube to be cut 

shorter.

14. For proper installation, assemble the drain to the bath.
15. 

If the overflow tube is not vertical or pushed out, the drain ell 

tube is too long.

16. 

To cut the drain ell tube to the proper length, the overflow 

tube must be vertical. Align the drain ell tube along side the 

drain tee. Mark the drain ell tube so it will engage the drain 

tee by at least 3/4”.

17. 

Cut the tube with a tube cutter. Remove any burrs.

18. 

Fit the linkage and overflow hood into the overflow ell, and 

secure with two plated screws.

19. 

Move the trip lever to the up position.

 

FIG. 6

FIG. 7

DRAIN INSTALLATION (CONT.)

Отзывы: