SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
GAS CONVEYOR HOSE INSTALLATION (CONTINUED)
39
TYPICAL RECIRCULATING WATER HOOK-UP FOR ALL GAS HEATED CONVEYORS
CONNECTION HOSES ARE CUT TO LENGTH DURING INSTALLATION.
(ENOUGH HOSE IS PROVIDED TO LOCATE THE GAS BOOTER HEATER APPROXIMATELY 9 FEET
AWAY FROM THE DISHMACHINE. ADDITIONAL HOSE MUST BE ORDERED IF A GREATER DISTANCE
IS REQUIRED. DISTANCES GREATER THAN 20 FEET AWAY CAN AFFECT THE HEATING PERFORMANCE
OF THE UNIT)
*
HOSES MARKED
A
IN THE ABOVE ILLUSTRATIONS CONNECT TO THE
INLET
WATER CONNECTION OF THE GAS BOOSTER HEATER
**
HOSES MARKED
B
IN THE ABOVE ILLUSTRATIONS CONNECT TO THE
OUTLET
WATER CONNECTION OF THE GAS BOOSTER HEATER
***
ITEMS MARKED
C
ARE THE INCOMING PLUMBING CONNECTIONS TO MACHINE THAT SHOULD BE 110 - 140 DEGREES
HOOKUP WHEN GAS BOOSTER HEATER
IS LOCATED TO THE
LEFT
OF THE
DISHMACHINE
NOTE HOW THE 90 ELBOW SWITCHES TO THE
OPPOSITE SIDE OF THE PIPING TEE TO ACCOMMODATE
THE HOSE COMING FROM THE OPPOSITE DIRECTIONS
THE RINSE TANK INLET
PIPE IS ROTATED 180 TO
ACCOMMODATE THE
HOSE COMING FROM
THE OPPOSITE
DIRECTION
*A
**B
***C
HOOKUP WHEN GAS BOOSTER HEATER
IS LOCATED TO THE
RIGHT
OF THE
DISHMACHINE
*A
**B
***C
Содержание AJ-64CGP
Страница 9: ...1 SECTION 1 SPECIFICATION INFORMATION...
Страница 37: ...29 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS...
Страница 52: ...44 SECTION 3 PREVENTATIVE MAINTENANCE...
Страница 57: ...49 SECTION 4 TROUBLESHOOTING SECTION...
Страница 61: ...53 SECTION 5 PARTS SECTION...
Страница 100: ...SECTION 5 PARTS SECTION 92 DRIVE ASSEMBLY 1 2 3 4 11 12 13 18 17 14 15 16 5 6 7 8 9 10 See Detail A...
Страница 121: ...113 SECTION 6 ELECTRICAL SCHEMATICS...
Страница 154: ...146 SECTION 7 JACKSON MAINTENANCE REPAIR CENTERS...
Страница 161: ......