INSTALLATION CHECKLIST
Please check off the following items as they are completed. All items must be completed and checked off
before proceeding to machine operation.
In the event that installation information is needed, please call one of Jackson Products authorized
service agencies, dealership where purchased or Jackson Products Company Technical Assistance
(813) 985-8144.
1. Is machine pitched up
1
1/4
-
1
1/
2
inch in front than rear?
2. For gravity drain systems — is machine's gravity drain connected to a open floor drain "vented to atmosphere"?
3. Is machine service voltage at L1 and L2 208-230 volts?
4. Is machine service voltage at L1 and neutral 104-120V?
5. Is machine properly grounded?
6. Is machine service breaker properly sized to total amp load as specified on data plate?
7. Is machine supplied with 140°F hot water at 20 PSI flow pressure with capacity of 52.3 gallons per hour?
8. Is water supply line to machine a minimum of
1/
2
inch?
9. Is a pressure reducing valve installed on inlet water line for pressures greater than 20 PSI flow?
10. Is equalizing vent vented to atomopshere?
11. Is pump intake strainer installed?
12. Is lower rinse spray arm installed?
13. Is wash spray head installed?
Содержание 24A-AF
Страница 33: ...1 BOOSTER TANK HEATER ELEMENT P N 0060000 2 ELEMENT GASKET P N 0060002...
Страница 37: ......
Страница 38: ......
Страница 40: ...WIRING DIAGRAM MODEL 24B SOLID STATE TIMER 115 208 230 VOLT 60 CY 1 PH...
Страница 42: ......
Страница 46: ...1 0052103 DRAIN FLOAT SWITCH 2 0052105 DRAIN FLOAT COVER 3 0052104 DRAIN CORD CLIPS DRAWING A 8...
Страница 48: ......
Страница 50: ......
Страница 52: ......
Страница 53: ......