CONFIDENTIAL
PROJECT NAME
| date
项目名称
|
日期
29
Troubleshooting
Err-09
Brake circuit
failure
1, check the electrical control box in the cement resistance plug is
off 2, check the cement resistance is burst 3, replace the cement
resistance 4, replace the control box
Err-10
HMI communication
failure
1, check the control panel and the electric control box connection
is off, loose, broken 2, restore the factory 3, replace the panel 4,
replace the control box
Err-11
Head stop
signal
failure
1, check the plug is loose 2, replace the encoder 3, replace the
control box
Err-12
Motor initial angle
detection
fault almost does not appear.
Err-13
Motor HALL fault
1, restore the factory settings 2, replace the motor encoder 3,
replace the control box.
Содержание A Series
Страница 1: ...CONFIDENTIAL PROJECT NAME date 1 A5 Computerized Lockstitch Machine...
Страница 2: ...CONFIDENTIAL PROJECT NAME date 2 product introduction A series product A3 A4 A4S Followed by A6 etc A5...
Страница 10: ...CONFIDENTIAL PROJECT NAME date 10 Adjust the needle place Long press when in screen shows can adjust...