Engine Overhaul Manual
Jabiru Aircraft
Pty Ltd
Jabiru 2200 & 3300 Aircraft Engines
This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.
ISSUE
1
2
3
4
5
6 7
Dated : 28/10/2014
Issued By: AS
Page: 177 of 201
L:\files\Manuals_For_Products\Engine_Manuals\Overhaul_Manual\JEM0001-7_Overhaul_Manual_DRAFT_(29_10_14).docx
9.9.11 Engine Post Run Procedure
– Stage J
Table 25
– Sheet J – Post Run Inspection
No.
Details
Para
Initials
Checked By
Date
J1
Heads re-torqued per Table 9. Valves adjusted (solid
lifter engines)
J2
Check induction/exhaust bolts
-
J3
Any changes to be made
-
J4
Rerun, check for oil leaks and/or any modifications
made (oil pressure/leaks etc)
-
J5
Check voltage output of alternator
Volts:
-
J6
Leak Down Test Results:
-
1
-
2
3
4
5
6
-
80
80
80
80
80
J7
Check all paper work
-
J8
Drain fuel/oil. Prepare for shipment, inhibited and
sealed
-
J9
Clean engine thoroughly.
-
J10
Remove spark plugs. Inhibit using a spray atomiser
with each piston in the down position. Rotate the
crankshaft 10
– 12 times. Use SHELL Aero fluid 2UN
(MIL-C-6529C Type 1) or similar engine corrosion
inhibitor. Install spark plugs and connect leads.
-
J11
Seal or cover all openings
-
J12
Attach a warning tag to the engine (oil drained
warning).
-
J13
Stage J - Post Engine Run Procedure Completed
I hereby certify that the above Post Run Procedure has been carried out in accordance with the applicable
Jabiru Pty Ltd Instructions and Maintenance procedures.
Signed:
Date:
for Jabiru Aircraft Pty Ltd