Engine Overhaul Manual
Jabiru Aircraft
Pty Ltd
Jabiru 2200 & 3300 Aircraft Engines
This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.
ISSUE
1
2
3
4
5
6 7
Dated : 28/10/2014
Issued By: AS
Page: 171 of 201
L:\files\Manuals_For_Products\Engine_Manuals\Overhaul_Manual\JEM0001-7_Overhaul_Manual_DRAFT_(29_10_14).docx
9.9.5 Subassembly D Build Sheet
– Sump
Table 19
– Build Sheet D
No.
Details
Para
Initials
Checked By
Date
D1
Clean and inspect the sump.
D2
Clean out blind threads using a suitable sized tap
D3
Ensure all seals and gaskets on plugs and
terminals are serviceable.
D4
Stage D - Stage Inspection of Assembly
I hereby certify that the above subassembly has been assembled in accordance with the applicable Jabiru
Pty Ltd Instructions and Maintenance procedures.
Signed:
Date:
for Jabiru Aircraft Pty Ltd
9.9.6 Subassembly E Build Sheet
– Flywheel, Ignition Coils, Starter Motor And Alternator
Table 20
– Build Sheet E
No.
Details
Para
Initials
Checked By
Date
E1
Clean and de-burr starter ring gear & bendix
gears.
E2
Assemble magnets, pole plates, tacho tags and
alternator rotor to flywheel
E3
Verify magnet strength and polarity correct
E4
Fit new bushes and bearings to starter motor &
bendix gear assembly. Fit new brushes to motor
& re-assemble with Loctite 243
E5
Assess fit of flywheel dowels
E6
Stage E - Stage Inspection of Assembly
I hereby certify that the above subassembly has been assembled in accordance with the applicable Jabiru
Pty Ltd Instructions and Maintenance procedures.
Signed:
Date:
for Jabiru Aircraft Pty Ltd