J/Boats J/70 Скачать руководство пользователя страница 13

J/70   Owner   Guide   

   

Page      

   

   

   

©   Copyright   2012,         J   Boats,   Inc.      All   Rights   Reserved   

13   

Mast   Boom   &   Standing   Rigging   

   
The   J/70   mast   &   boom   are   built   by   Southern   Spars   of   carbon   fiber   and   painted   black   with   white   limit   

marks.      The   mast,   masthead   crane   and   spreaders   are   also   built   of   carbon   fiber   and   painted   black.         
   
The   deck   stepped   mast   has   a   SS   tabernacle   deck   mounted   plate   with   cast   aluminum   mast   foot.      The   
system   allows   the   mast   to   articulate   outboard   in   order   to   be   attached,   hoisted   and   lowered   to   the   SS   deck   
plate   while   the   keel   is   in   its   raised   position.      
   

The   carbon   mast   includes   provisions   for   three   internal   halyards   (mainsail,   jib   &   spinnaker)   including   
cleating   at   the   mast   base.      The   main   halyard   terminates   on   the   black   horn   cleat   to   port   while   the   jib   and   
spinnaker   halyards   lead   to   the   Harken   pivot   blocks   on   the   mast   with   spinnaker   to   starboard.      An   
aluminum   mast   track   is   provided   with   two   gate   options   (interchangeable).      One   option   is   for   use   with   a   
bolt-­‐rope   style   luff   on   the   mainsail,   the   other   is   for   use   with   mainsail   sliders   to   keep   the   mainsail   captive   
to   the   mast.      Mast   is   also   equipped   with   two   strap   eyes   at   the   mast   base,   a   vang   lug   and   a   boom   gooseneck   
fitting.   

   
The   J/70   boom   is   equipped   with   an   adjustable   outhaul   system   led   to   a   jam   cleat   and   lead   block   on   
inboard   end   of   boom,   soft   attachments   for   both   the   vang   block   and   the   mainsheet   strop,   Antal   sheaves   
outboard   for   both   outhaul   and   a   clew   reef,   and   finally   a   jam   cleat   and   cheek   block   for   the   inboard   end   of   
an   optional   owner   supplied   clew   reef   line.   
   
   

   

IMPORTANT!   CARE   SHOULD   BE   TAKEN   WHEN   HOISTING   AND   LOWERING   THE   MAST   

TO   FIRST   REMOVE   THE   VANG   LUG   AND   TO   PROPERLY   SUPPORT   AND   PAD   THE   MAST   

AT   ALL   TIMES   IN   ORDER   NOT   TO   DAMAGE   THE   MAST   TRACK,   THE   MOLDED   DECK   

RISER   AROUND   THE   COMPANIONWAY   AND   THE   SS   DECK   PLATE.   

   

   

Jib   halyard   fine   tune   adjustment   

   
Unique   to   the   J/70   is   a   jib   halyard   fine   tune.      This   is   a   4:1   floating   purchase   system   on   the   port   side   of   the   
mast   that   attaches   to   a   spliced   loop   on   the   jib   halyard   that   appears   from   the   jib   halyard   exit   on   the   mast   

once   the   jib   is   hoisted.      The   beauty   of   this   system   is   that   the   jib   halyard   tension   can   be   controlled   right   
from   the   cockpit   without   the   need   for   winches.   

Jib   Furling   System   

   
The   J/70   is   equipped   with   the   Harken   small   boat   below-­‐deck   jib   furler   system.            The   system   includes   a   
hoist-­‐able   swivel   that   rides   on   the   headstay,   a   top   swivel   and   a   deck-­‐mounted   swivel   with   below   deck   
drum.      Because   the   headstay   itself   (and   thus   the   sail)   is   what   swivels,   it   is   sensitive   to   halyard   tension   and   

initial   set-­‐up.      The   furler   is   not   designed   for   a   partially   reefed   position   so   you   should   plan   to   either   sail   
with   the   jib   entirely   rolled   up   or   fully   unrolled.      Please   read   the   complete   guide   provided   by   Harken   to   
best   understand   the   system   and   how   to   get   the   best   results   from   it.      For   initial   set   up   the   furling   line   
should   be   rolled   onto   the   drum   in   a   counter   clockwise   direction.   

Cockpit   Safety   Lines   

   

The   safety   lines   surrounding   the   J/70   cockpit   are   built   by   Marlow   Ropes   and   made   from   5mm   Dyneema   
or   otherwise   known   as   UHMwPE.      These   “soft   lifelines”   are   attached   by   luggage   tagging   the   forward   end   

Содержание J/70

Страница 1: ...Yacht Name Owner Name...

Страница 2: ...J 70 Owner Guide Page Copyright 2012 J Boats Inc All Rights Reserved 2...

Страница 3: ...alyard System 13 Jib Furling System 13 Cockpit Safety Lines 13 Running Rigging 14 Rigging Your J 70 15 Mainsheet Traveler 17 Backstay System 18 Boom Vang Cunningham 19 Halyard Mast Base Layout 20 Head...

Страница 4: ...porting outfitting the vessel with proper safety equipment and the safe operation of the vessel Your J Boats Dealer will be happy to refer you to Boating Safety Courses or other seminars available Ple...

Страница 5: ...uble shooting guide In case of difficulty refer to the boat dealer builder or its representative Always use trained and competent people for maintenance fixing or modifications Modifications that may...

Страница 6: ...turer s Recommended Maximum Total Load 530 kg 1 168 lbs Includes crew This assessment has been made assuming that all standard equipment is aboard and that the boat in light craft condition has a mass...

Страница 7: ...l Area OD Class 16 07 sq m 173 sq ft Spinnaker Area OD Class 45 61 sq m 491 sq ft I 8 159m 26 77 ISP 9 189m 30 15 J 2 341m 7 68 P 7 973m 26 16 E 2 877m 9 44 Headstay Pin to Pin Length 05 14 12 8432 mm...

Страница 8: ...info jboats com www jboats com 401 846 8410 Manufacturer C C Fiberglass Components Inc 75 Ballou Blvd Bristol RI 02809 info ccfci com www ccfci com 401 254 4342 J 70 Suppliers Phone Web Global BSI In...

Страница 9: ...on air dry gelcoat finish Interior Structure J 70 interior structure includes several transverse bulkheads a V berth platform reinforced keel trunk and longitudinal hull support members Each of these...

Страница 10: ...front end of cockpit until the cutting blade hits the G 10 composite cutting block that s molded into the hull Once the cutter has been used several times a narrow groove will develop in the G 10 bloc...

Страница 11: ...e keel bulb to the trailer keel tie downs may be enough to keep the boat and keel braced together to the trailer Please refer to the Triad Trailer owner manual for more specific information and traile...

Страница 12: ...d and hasp is mated with the drop board hasp eye and boat can then be locked For the covered position the cover should be installed to its hinges and the shock cord attached to the SS eye mounted to t...

Страница 13: ...e inboard end of an optional owner supplied clew reef line IMPORTANT CARE SHOULD BE TAKEN WHEN HOISTING AND LOWERING THE MAST TO FIRST REMOVE THE VANG LUG AND TO PROPERLY SUPPORT AND PAD THE MAST AT A...

Страница 14: ...lifeline pad s and reinsert the thimble it will be somewhat loose Take the lashing the shorter thinner piece with the eye splice in one end and luggage tag it through the bale on the stern pushpit Pas...

Страница 15: ...rnbuckle Consult your sailmaker for a more specific recommendation Install headstay Install all side shrouds Be sure that the five black rubber plugs are inserted into the shroud to mast terminals so...

Страница 16: ...stern rails in order not to overstress the SS loop on the mast deck plate when lowering the mast Lift the mast while a helper pulls the extended spinnaker or main halyard from the front of the boat O...

Страница 17: ...dle Block 2621 Harken Carbo Ratchet Block 2135 Harken Cam Base for 57mm 144 3 16 5 1 Mainsheet J 70 Mainsheet Layout 2 C 9 2 C 9 Harken Micro Cam Cleat w fairlead 468 424 Harken 29mm fixed block 348 o...

Страница 18: ...y System 5mm DYNEX 75 Backstay Forged Shackle Soft Eye Splice One Side Harken 29mm Fixed Block 348 on SS Eye Strap 073 P S Harken 29mm Cheek Block 350 P S Harken Micro Cam Cleat w fairlead 468 424 P S...

Страница 19: ...Harken 150 Cam w 425 Fairlead Port Stbd Harken 40mm Carbo T2 Loop Blocks 2148 one on vang lug one each on mast strap eyes P S J 70 Boom Vang Layout J 70 Cunningham Cunningham 3mm D12 Dyneema through s...

Страница 20: ...on Ronstan SS Hook 4 1 Jib Halyard Purchase Line Harken 291 Mast Mounted Harken 40mm T2 Loop Block 2148 for Jib halyard tail Jib Halyard Purchase Strop Harken 40mm T2 Loop Block 2148 Harken 29mm T2 Lo...

Страница 21: ...Harken 207 Top Swivel T Bar Eye Custom SS 316 Southern Spars w 5mm marine eye Headstay Wire 5mm 1 x 19 SS with 5mm marine eye termination Head of Jib Antal Halyard Sheave Top of Headstay Detail Botto...

Страница 22: ...Car with S40 Orbit Block Ronstan RC72581 Series 25 Track End Stop 2 1 Jib Sheet terminates on front of Car J 70 Jib Sheet Layout C 2 9 Antal Clew Reef Sheave Clew Reef Exit Clew Reef Jam Cleat Harken...

Страница 23: ...J 70 Owner Guide Page Copyright 2012 J Boats Inc All Rights Reserved 23 J 70 Deck Layout...

Страница 24: ...Reserved 24 J 70 Bow Sprit Furler Controls 0 4 C Ronstan Fairleads for jib furler control Ronstan SS Lined Fairleads for jib furler control Ronstan SS Lined Fairlead pole control line Pole Control Lin...

Страница 25: ...Owner Guide Page Copyright 2012 J Boats Inc All Rights Reserved 25 J 70 Bow Drainage Locker Access Sealed Removable Access hatch Sprit Furler Drainage Locker Drain Hole starboard side Harken Furler D...

Страница 26: ...19 Twist Shackle attached to Harken 308 Wire Block Black Anodized Custom Aluminum Fabrication Harken 310 Thru Deck Wire Block Dutton Lainson WG1500 w HEX drive Black Dedicated keel stop plate to preve...

Страница 27: ...battery charge for outboard Remove all trailer tie down straps except for bow winch strap Rig the keel crane and lift keel off the keel support tray Extend optional trailer extension if necessary Laun...

Страница 28: ...ed on either side of the keel below the keel cover Both padeyes are designed for use along with a secured lifting strap for hauling and or launching operations with yacht club or boatyard single point...

Страница 29: ...with the upper backstay This shroud setting is a good all around starting point In sea trialing the J 70 with several sailmakers we arrived at the following general grid using a LOOS PT 2 tension gau...

Страница 30: ...ouds J 22 J 80 style it s a lot of extra distance to travel and one risks dragging the tack foot of the spinnaker in the water Always remember to tape the halyard shackle after attaching It can otherw...

Страница 31: ...therwise left entirely to the owner to determine when a survey should occur KEEL KEEL FLOORS Overview One of the most critical areas of a modern fin keeled composite boat is the keel and keel floor ar...

Страница 32: ...ere is ingress through cracks in the paint gelcoat in the bilge The process of hydrolysis is persistent and invisible it s water that chemically degrades the quality and strength of the laminate over...

Страница 33: ...ntered over the boat and such that the mast is in column or straight as you site up the mast groove on the aft side Proper tuning for all conditions usually means maintaining enough tension on the shr...

Страница 34: ...an integral bulkhead housing support The system can easily be damaged particularly when struck laterally or vertically at the end of the pole with any force e g when rounding marks hitting sterns hit...

Страница 35: ...ly encourage all owners to start by inspecting their boats now to best ensure a long productive life FOOTNOTE The contents of this article are thought to be accurate but do not necessarily include all...

Страница 36: ...b Halyard Purchase strop 1 3 Excel D12 Black 25mm soft eye 25mm soft eye 3 0 Jib Sheet 2 1 1 8 MB12 Red Grey whip whip 47 9 Spinnaker Halyard 1 6 8 Plait Prestretch Blue Splice on shackle ball whip 75...

Отзывы: