background image

TrueNAS Unified Storage Array

 

Basic Setup & Deployment

The complete TrueNAS User Guide is available 

 

at support.iXsystems.com and by selecting Guide 

 

from within the TrueNAS UI.

For assistance, please contact your TrueNAS  

Support Representative:

8x5:

 1 (855) 473-7449 option 2 (US Only Toll-Free)

 

1 (408) 943-4100 Option 2

Email:

 [email protected]

After Hours (24x7 Gold Level Support Only):

1 (855) 499-5131 (US Only Toll-Free)

 

1 (678)-353-0154 (Local and International)

Step 8. Install the drive trays

  

in the enclosure.

Step 9. Connect the expansion shelves.

  

Refer to 

the corresponding Basic Setup & Deployment Guide included 
with each expansion shelf.

Step 10. Prepare for initial configuration.

  

Connect 

the network cables and Out of Band Management port before 
attempting to configure and power on the TrueNAS Array for 
the first time.  If you submitted a pre-configuration worksheet 
to iXsystems, the Out of Band Management interface will 
already be configured.  Otherwise, you will need to configure 
the Out of Band Management interface before it can be used.

Refer to the TrueNAS User Guide

1

 for instructions on 

configuring TrueNAS for Out of Band Management.  If you are 
unable to set up Out of Band Management before the initial 
configuration, connect a VGA monitor and a USB keyboard 
connected to the TrueNAS Array.  

Do not power on the 

TrueNAS until Step 13

.

Step 11. Attach the TrueNAS faceplate

 

by inserting 

the two tabs into the holes at the right side of the face of the 
appliance, then push the left side of the faceplate until it locks 
into place on the array face.  The TrueNAS emblem on the 
faceplate is a global fault detection LED.  When the system is 
optimal, the emblem LED will shine its normal white color.  If 
there are any errors detected, the emblem LED will change to 
glowing red.  If the emblem LED is red, click the Alert icon in 
the upper right corner of the TrueNAS UI for more details on 
the specific error.

Step 12. Power on all expansion shelves

 

that are 

connected to your TrueNAS Array and wait two minutes 
before plugging in the power cords on the TrueNAS Array.

Step 13. Plug in the power cords.

  

When you are 

ready to power on the TrueNAS Array, plug in the two power 
cords, first into the power supplies then into the power 
outlet.  The power cords are provided in the accessory kit.  
The array is configured to automatically power on when 
connected to a power outlet.  It is designed this way so that 
the TrueNAS Array will automatically power back on following 
a power failure even after the power has been restored.

Note:

 

The power button on the left side of the TrueNAS 

Array corresponds with Storage Controller 1 (top) and 
the power button on the right corresponds with Storage 
Controller 2 (bottom).  In non-HA systems, the buttons for 
Storage Controller 2 are disabled.

Step 14. Perform TrueNAS initial software 

configuration.

  

If you submitted a pre-configuration 

worksheet to iXsystems, access the IP address you requested 
for the TrueNAS Array using a web browser attached to the 
same network as the TrueNAS Array.  Otherwise, contact your 
TrueNAS Support Representative.

Controller 2

 

(Bottom)

Controller 1

 

(Top)

1 Left

2 Right

1

 

The Guide is available from 

support.iXsystems.com

 or by clicking the Guide icon in the 

TrueNAS UI.

Copyright © 2017 iXsystems.  TrueNAS is a registered trademark of iXsystems, Inc.  

 

All rights reserved.

Отзывы: