l
Remove all external plastic protective film prior to chassis operation.
l
Operator intervention may be required to power cycle the XGS12 chassis or restart a software
program in the event the XGS12 chassis operation is upset or stopped by electrostatic discharge.
Chapter 3 Install XGS12 Chassis
– 6 –
Содержание XGS12
Страница 1: ...XGS12 Chassis Platform Release 9 10 Assembly Guide Document version 202008071545 05 30...
Страница 11: ...Chapter 1 Introduction 2...
Страница 13: ...This page intentionally left blank 4...
Страница 23: ...This page intentionally left blank 14...
Страница 38: ...Ixia a Keysight Business 26601 West Agoura Road Calabasas California 91302 Keysight Technologies 2020...