16
Pipework
1
2
Pipework
Connect tubes to the pump.
Before operation
• Cut the tube ends flat.
Tube connection
a.
The short tubing with the minimum bends is optimal to reduce resist-
ance.
b.
Use vinyl tubes resistant to the pumping pressure.
Tube I.D. should be equal to the O.D. of the pump
inlet/outlet for the prevention of gas ingress/leak or
other failure.
* Do not have tubing bent or pressed. Otherwise, the tube
end may break.
Connect tubes into the inlet and outlet.
Push the tubes into the inlet and outlet as far
as they will go.
*
I
f suction line connection is imperfect, the pump
sucks air and it prevents the pump from bringing
out full performance.
Valve mounting
Install a valve in the suction line for adjusting an air flow.
Tube end (Side view)
Inlet
Outlet