
- 14 -
Operation
■ Stop and Storage
Before a long period of stoppage (1 week or more)...
●
Release pressure and turn off main power.
●
Make sure both supply air and gas are stopped.
Before resuming operation...
●
Operation may occasionally be upset in the beginning. In
this case warm up the pump under no load operation in
advance.
●
Follow the "
■
Operation" table to resume operation.
Содержание APN-085-W
Страница 1: ...Read this manual before use of product APN 085 W Instruction Manual IWAKI Gas Liquid Transfer Pump...
Страница 21: ...19...
Страница 22: ...20...
Страница 23: ...21...