- 14 -
●
Do not use solvents such as
benzine, alcohol, thinner for
maintenance or cleaning,
otherwise a coat discolours
or comes off.
2. Pump operation
■ Start-up
1.
Before pump operation, check that each tube connection is
secured.
2.
Check that a suction line is connected to the inlet and a dis-
charge line to the outlet.
CAUTION
If a suction line and a discharge line are connected the
other way around, pumping process is inverted.
3.
Check that the pump is firmly fixed on a mounting position.
■ Operation
Operate the pump according to the following steps.
No.
Procedure
Points to be Checked
1 Check tubing, wir-
ing and voltage.
• See "2.2 Tubing" and "2.3
Electrical wiring" sections.
• Check the spec label to see if
power supply voltage is correct.
2 Open valves.
• Fully open both discharge and
suction lines.
3 Supply power to the
pump.
• Check the item 1 and 2. Then turn
on power and start the pump.
• Smooth starting may not be
obtained when ambient tempera-
ture is 10ºC or below. In this case,
run the pump with no discharge
line pressure for a few minutes to
warm it up.
4 Adjust air flow.
• Provide a running-in period before
full scale operation.
• Always adjust an air flow by a suc
-
tion valve.
Operation
Содержание APN-085-D4 Series
Страница 1: ...Read this manual before use of product IWAKI Air Pump APN 085 D4 Instruction Manual ...
Страница 23: ... 21 ...