ORBITALUM TOOLS GmbH
D-78224 Singen www.orbitalum.com
[REV. 20200320] OC_PS_BA_790048761_00__INH-02_EN
46
Initial operation
PS 4.5 PLUS
eNGLISH
6. INITIAL OPeRATION
6.1
Checking the parts of delivery
• Check delivery for completeness and damage caused by transport.
• Report any missing parts or damage caused by transport to your supplier immediately.
6.2
Included with the machine
Subject to modifications.
Portable tube saw
Pc.
1
Cast aluminum clamping jaws
Set
1
Durable storage and shipping case
Pc.
1
Saw blade (Code 790 048 072)
Pc.
1
Ring spanner (SW22)
Pc.
1
Allen screws (M8 x 80) for mounting the machine on the work bench
Pc.
4
Allen keys (SW5, SW6, SW8)
Pc.
3
Brush
Pc.
1
Tool bag
Pc.
1
GF TOP saw blade lubricating compound
Tube
1
Operating instructions and spare parts list
Set
1
7. STORAGe AND TRANSPORT
ATTeNTION!
Incorrect machine storage!
Diverse physical injuries and material damage.
X
Store the machine in its original crate in a dry environment.
DANGeR!
Fatal electric shock!
X
Before transportation or changing the workplace, switch off the machine, wait until the
machine/tool stops running and pull the mains plug.
WARNING!
During transportation, the ON/OFF switch may unintentionally be activated
causing the machine to start up!
Diverse physical injuries and material damage.
X
Before transportation or changing the workplace, switch off the machine, wait until the
machine/tool stops running and pull the mains plug.
WARNING!
Heavy weight when transporting the machine!
Danger of being injured through overstraining.
X
Remove the machine with 2 persons from the case.
X
Transport machines over long stretches with corresponding lifting aids.
X
The machine with shipping case should be carried by 2 persons. The shipping case is
equipped with respective carrying handles.