Commissioning protocol Greenline HE
6 720 802 419 (2012/06) en
78
21
Commissioning protocol Greenline HE
Customer/responsible for installation:
Installer of installation:
Heat pump type:
Serial number:
Commissioning date:
Date of manufacture:
Type of collector:
Total length of collector:
Other components in the installation:
Additional heat
Room sensor T5
Water heater
Exhaust air collector
3-way valve
Hot water sensor T3
Flow line sensor heating circuit 2 E12.T1
Miscellaneous:
The following work has been carried out:
Heating system: filled
vented
particle filter cleaned
minimum flow ensured
installation of T1 checked
Heat curve set
Collector system: filled
vented
particle filter cleaned
vents installed
collector fluid concentration checked
Electrical connection: performed
motor cut-out settings checked
Sight glass: checked
notes:
Operating temperatures after 10 minutes heating/hot water operation:
Heat transfer fluid out (T8):.................. °C
Heat transfer fluid in (T9):................ °C
Temperature difference between Heat transfer fluid out (T8) and in (T9) approx. 6 ... 10 K ( °C)
Collector circuit in (T10): .................. °C
Collector circuit out (T11): .................. °C
Temperature difference between Collector circuit in (T10) and Collector circuit out (T11) approx. 2 ... 5 K ( °C)
Setting heat carrier pump (G2):
Setting collector circuit pump (G3):
Leak test for heating system and collector system carried out
Function check carried out
Customer/responsible for installation: has been informed of how to operate the heat pump
Documentation handed over
Date and signature of installation installer:
Table 177