MAINTENANCE

SCHEDULE:

• Blow down weekly when the boiler is 

in operation.

• Disassemble and inspect annually. Replace 

the control if it is worn, corroded, or if com-
ponents no longer operate properly.

• Inspect the float chamber and equalizing 

piping annually. Remove all sediment 
and debris.

• Replace the blow down valve every 10 years.

More frequent replacement may be required 
if it is used in locales where significant water 
treatment is required, where more frequent 
cleaning is necessary, or in applications with 
high make-up water requirements.

PROCEDURE:

1. Blow down the low water cut-off when the 

water level is at its normal level and the burner 
is on. Slowly open the blow down valve until it 
is fully open and observe the water level fall in 
the gauge glass. Close the valve after verifying 
that the burner shuts off. If this does not 
happen, immediately shut off the boiler and 
correct the problem.

To prevent serious personal injury from steam
pipe blow down, connect a drain pipe to avoid
exposure to steam discharge.

Failure to follow this caution could cause
personal injury.

!

CAUTION

3500 N. Spaulding Avenue
Chicago, Illinois 60618
tel:  773 267-1600
fax: 773 267-0991
www.mcdonnellmiller.com

©2001 ITT Industries Inc.
Printed in U.S.A.   12-01   210286

Содержание McDonnell & Miller 14-B Series

Страница 1: ...serious burns wear heat resistant gloves when opening and closing valves or handling hot equipment To prevent serious burns allow the control and surrounding equipment to cool to 80 F 27 C and allow...

Страница 2: ...n valve D B D C C D B STEP 1 Preparation INSTALLATION TOOLS NEEDED One 1 flathead screwdriver one 1 scraper one 1 pipe wrench one 1 hammer and pipe sealing compound a Shut off the boiler and disconnec...

Страница 3: ...ontrol A If necessary use a hammer to tap it loose D D A A g Inspect the float chamber E for debris Carefully remove any debris mud or other for eign matter which may obstruct the float s full range o...

Страница 4: ...mble as shown J H Gasket Teflon Seal Teflon Seal Spring Ball Housing J b Position the blow down valve H onto the control s mating surface G So that it s handle K is acces sible and is able to swing th...

Страница 5: ...4 20mm NPT blow down pipe M and screw it into the control N Tighten the pipe M with a pipe wrench P to approximately 47 ft lb 64 N m M P N g Turn the blow down valve handle K to its closed position K...

Страница 6: ...he problem Other equipment may be involved and the sys tem should be inspected by qualified personnel d Verify that the burner is off and that the system is filling with water by observing the water l...

Страница 7: ...akage continues follow Step 1 to remove the blow down valve H Closely following the installation instructions replace it 2 If leakage occurs around the valve shaft S follow Step 1 to remove the blow d...

Страница 8: ...ter requirements PROCEDURE 1 Blow down the low water cut off when the water level is at its normal level and the burner is on Slowly open the blow down valve until it is fully open and observe the wat...

Отзывы: