•
Make sure that all lubrication passages are clear.
•
If the frame has been exposed to pumped fluid, inspect the frame for corrosion or pitting.
•
Inspect the inboard-bearing bores.
Surface inspection locations
This figure shows the areas to inspect for wear on the bearing frame inside and outside surface.
Figure 47: Inside and outside inspection locations
6.5.4 Seal chamber and stuffing box cover inspection
Checklist
Perform these checks when you inspect the seal chamber and stuffing box cover:
•
Make sure that these surfaces are clean:
•
Seal chamber and stuffing box cover
•
Mounting
•
Make sure there is no pitting or wear greater than 3.2 mm | 1/8 in. deep.
Replace the seal chamber and stuffing box cover if pitting or wear exceeds this measurement.
•
Inspect the machined surfaces and mating faces noted in the figures.
These images point to the areas to inspect:
6.5 Pre-assembly inspections
Model IC, ICI, ICH, ICIH Installation, Operation, and Maintenance Manual
77
Содержание Goulds Pumps IC
Страница 1: ...Installation Operation and Maintenance Manual Model IC ICI ICH ICIH ...
Страница 2: ......