Figure 17:
Priming by Automatic Primer Pump
Where there is a fluctuating suction lift that occasionally might drop below the normal limits of the pump
or for installations where there is any quantity of air entrained with the liquid being pumped, the system
shown in
is very well adapted.
A vacuum tank and a vacuum gauge can be installed near the primer pump and the vacuum switch set
to automatically start or stop the primer pump according to the vacuum required to keep the system
primed.
Figure 18:
4.2 Regulation of cooling water flow
The supply of liquid to the water-cooled bearings and quenching glands should be regulated by valves in
the supply line. Approximately ½ G.P.M. to each gland and G.P.M. to each bearing cooling coil is suffi-
cient. The cooling lines should be checked periodically to see that they have not become clogged.
4.2 Regulation of cooling water flow
30
3405-3406-3416 Installation, Operation and Maintenance Instructions
Содержание Goulds Pumps 3405
Страница 1: ...Installation Operation and Maintenance Instructions 3405 3406 3416 ...
Страница 2: ......
Страница 19: ...Figure 6 2 5 Install suction piping 3405 3406 3416 Installation Operation and Maintenance Instructions 17 ...
Страница 41: ...7 3 Sectional view 7 3 Sectional view 3405 3406 3416 Installation Operation and Maintenance Instructions 39 ...
Страница 42: ...7 3 Sectional view 40 3405 3406 3416 Installation Operation and Maintenance Instructions ...