Item Description
1.
Baseplate
2.
Shims or wedges
3.
Grout
4.
Foundation
5.
Sleeve
6.
Dam
7.
Bolt
Figure 23: Pour grout into baseplate
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
1
5
4
2
3
Item Description
1.
Baseplate
2.
Grout
3.
Foundation
4.
Dam
5.
Bolt
Figure 24: Fill remainder of baseplate with grout
7.
Tighten the foundation bolts.
8.
Recheck the alignment.
4.6 Bypass-piping considerations
When to use a bypass line
Provide a bypass line for systems that require operation at reduced flows for prolonged periods. Connect
a bypass line from the discharge side (before any valves) to the source of suction.
When to install a minimum-flow orifice
You can size and install a minimum-flow orifice in a bypass line in order to prevent bypassing excessive
flows. Consult your ITT representative for assistance in sizing a minimum-flow orifice.
4.6 Bypass-piping considerations
40
Models 3180, 3181, 3185, and 3186 Installation, Operation, and Maintenance Manual
Содержание GOULDS PUMPS 3180
Страница 1: ...Installation Operation and Maintenance Manual Models 3180 3181 3185 and 3186 ...
Страница 2: ......
Страница 153: ...9 1 Certificates of conformance Models 3180 3181 3185 and 3186 Installation Operation and Maintenance Manual 151 ...
Страница 155: ...9 1 Certificates of conformance Models 3180 3181 3185 and 3186 Installation Operation and Maintenance Manual 153 ...