372T
228A
761B
Figure 38: Attaching the condition monitor to bearing the frame
2.
Tighten the hex-head screw to 8 Nm | 6 ft-lbs.
More detailed information is available on:
http://www.ittproservices.com/aftermarket-products/monitoring/i-alert2/i-ALERT2.com
6.6.12 Post-assembly checks
Perform these checks after you assemble the pump, then continue with pump startup:
•
Rotate the shaft by hand in order to make sure that it rotates easily and smoothly and that there is
no rubbing.
•
Open the isolation valves and check the pump for leaks.
6.6.13 Assembly references
6.6.13.1 Spare parts
Recommended spare parts
In order to prevent a long and costly downtime period, especially on critical services, it is advisable that
you have these spare parts on hand:
•
Back pull-out assembly, this is a group of assembled parts which includes all parts except casing
and sideplate or casing wear ring.
•
Bearings (112 and 409)
•
Bearing locknut (136)
•
Bearing lockwasher (382)
•
Impeller key (178)
•
Impeller nut (304)
•
Maintenance kit that includes all gaskets and O-rings required for one pump
•
Mechanical seal (where applicable) (383)
•
Shaft (122)
•
Shaft sleeve (126)
•
Sideplate (where applicable) (176)
6.6 Reassembly
114
Models 3180, 3181, 3185, and 3186 Installation, Operation, and Maintenance Manual
Содержание GOULDS PUMPS 3180
Страница 1: ...Installation Operation and Maintenance Manual Models 3180 3181 3185 and 3186 ...
Страница 2: ......
Страница 153: ...9 1 Certificates of conformance Models 3180 3181 3185 and 3186 Installation Operation and Maintenance Manual 151 ...
Страница 155: ...9 1 Certificates of conformance Models 3180 3181 3185 and 3186 Installation Operation and Maintenance Manual 153 ...