Table 6: Frame Adapter to Casing Bolts Torque Specifications
Casing Size
Torque, N-m | ft-lbs
12 inch
91 | 67
14 inch
244 | 180
18 inch
201 | 148
22 inch
233 | 172
28 inch
499 | 368
23. Install pedestal hold-down bolts. Frame pedestal is not to be flush with bedplate. Clearance of 1/4"
is normal. Install shims under pedestal before tightening.
24. Set impeller clearance as outlined in
6.3 Impeller Clearance Adjustment on page 53
tween impeller and sideplate should be set at 0.381mm | 0.015" to maintain optimum efficiency.
Overall travel must be 1.499mm to 2.159mm | 0.059" to 0.085" dependent on tolerances. If not,
check casing gasket to be sure it is 1.588mm | 1/16" thick.
25. If unit requires stuffing box packing, refer to
5.4 Stuffing Box Packing on page 33
and pack as di-
for alternate methods of packing.
26. Replace auxiliary piping.
27. Follow procedures outlined in this manual for preparation and operation of the unit.
NOTICE:
Pay particular attention to instructions concerning alignment and lubrication.
6.8 Set the Mechanical Seals
WARNING:
The mechanical seal used in an ATEX classified environment must be properly certified.
CAUTION:
Running a mechanical seal dry, even for a few seconds, can cause seal failure and physical
injury. Never operate the pump without liquid supplied to the mechanical seal.
1.
With the bearing frame-shaft assembly completed, carefully slide the gland-stationary seat assem-
bly, with gaskets in place on the shaft. Install shaft sleeve.
2.
Carefully slide the stuffing box cover over the sleeve and bolt to the bearing frame.
3.
The following method may be employed to determine the correct positioning of the rotary portion of
the mechanical seal:
a) Scribe the shaft sleeve at the face of the stuffing box.
6.8 Set the Mechanical Seals
3175 Installation, Operation and Maintenance Instructions