7.4.2 Return pump to the manufacturer
Repair work may only be executed if the declaration of no objection
has been filled out and submitted (
Chapter 9.2 ‘Declaration of no
n
Pump removed.
n
Pump cooled.
n
Pump cleaned.
n
All flanges and bore holes plugged.
1.
Only return pump or individual components to ITT Bornemann GmbH
Chapter 9.2 ‘Declaration of no objection’ on page 74
).
2.
Depending on the desired repair, observe the required measures for return
in accordance with the following table.
Measures for return
Repair
Measures for return
To be performed by ITT Bornemann
GmbH
n
Rinse pump and decontaminate in
the event of hazardous pumped
media.
n
Return complete pump (not disas-
sembled) to ITT Bornemann
GmbH.
n
Specify the following details:
–
Reason for repair
–
Operating conditions
With warranty claim via ITT
Bornemann GmbH
n
Rinse pump and decontaminate in
the event of hazardous pumped
media.
n
Return complete pump (not disas-
sembled) to ITT Bornemann
GmbH.
n
Specify the following details:
–
Information about occurrence
of damage
–
Operating conditions
7.5 Repair pump
Trained customer service engineers from ITT Bornemann GmbH
are available for installation and repairs. Upon request, present veri-
fication for the pumped material – DIN safety data sheet or declara-
Chapter 9.2 ‘Declaration of no objection’
Repair instructions can be ordered together with replacement parts
for self-repairs.
Prerequisites:
Maintenance and repairs
Type SLH-4G, SLHS-4G
67
01/2016 JPB Rev. 5