Regulator Start-up

After the pressure regulator has been installed, make sure that 
the on/off valve upstream and downstream and the vent valve are 
all closed.

 

» Partially open the upstream on/off valve slowly enough to pass 

a very small amount of gas;

 

» Reset the safety shutoff valve (see the relevant Instruction 

Manual). Note that a safety shutoff valve with over and 
under- pressure protection is always closed in absence of 
gas downstream from the regulator, where its sensing line is 
connected.

 

» Check that the pressure rises slowly; the downstream pressure 

must stabilize around the set value. If the pressure continues to 
rise, interrupt the starting procedure by closing the upstream 
on/off valve and identify the cause of the malfunction;

 

» After the outlet pressure has stabilized, open the on/off valve 

completely;

 

» Then slowly open the downstream on/off valve until the piping 

is completely filled.

At this point, the pressure regulator is operative.

Monitor Start-up

The same procedure must be followed when starting a monitor 
and active system, bearing in mind that the pressure gauge 
installed in the section in between the two regulators must 
indicate the same pressure value as the upstream gauge.

Pressure Regulator Setting

The pressure regulator is usually delivered already set to the 
specifications indicated in the order sheet. Whenever the set 
pressure must be modified, this value must be set within the 
setting range of the spring installed.
Make sure there is a flow demand or open the vent valve 
downstream of the regulator. This valve should be closed after 
the desired set pressure is obtained.

 

» To increase the set pressure: rotate the adjustment screw 

clockwise using the adjustment wrench - see Fig 8.

 

» To decrease the set pressure: proceed as above, rotating the 

spring adjustment screw counter-clockwise.

Maintenance

The maintenance operations required for the pressure regulator 
(and the safety shutoff valve) are closely linked to the quality of 
gas supplied (in terms of moisture content, liquid hydrocarbons 
and impurities in general) and to the degree of filtration performed 
upstream of the pressure regulator.
For this reason we recommend always installing a 

cartridge 

filter

 upstream from the pressure regulator that is capable of 

withholding the solid and liquid particles present in the gas that 
might otherwise compromise efficient operation.
All pressure must be discharged before performing any 
maintenance operation on the pressure regulator by proceeding 
as follows:

 

» Close the on/off valves upstream and downstream,

 

» Slowly discharge the pressure by opening the vent valve 

downstream from the pressure regulator until the gauge 
indicates zero.

Before performing any maintenance operation on pressure 
regulators fitted with 

overpressure and under pressure

 

shutoff devices, open the bypass between the inlet and outlet 
chambers (see Instruction Manuals for safety shutoff valve). This 
relieves the pressure that otherwise would be trapped upstream 
from the valve disc of the safety shutoff device.

Disassembly

Check the following before beginning any disassembly 
operations on the pressure regulator:

 

» The regulator must be depressurized as described above;

 

» The wrenches and other tools required for the operation must 

be close at hand;

 

» Spare parts to replace damaged parts must be immediately 

available.

Remember to:

 

» Disassemble the actuator top casing only after removing the 

loading spring;

 

» Disassemble all parts carefully in order to avoid damage. Pay 

extra attention to the rubber parts (using the appropriate tool 
for the disassembly of the O-rings) and replace all parts that 
exhibit even the slightest signs of damage.

Built-in safety valve

Thanks to its modular design, the retrofit - or change of 
safety valve model - can be easily made on the field without 
dismounting the regulator from the gas line. See Fig 9.

Noise abatement cage (silencer) 

This part can be easily accessed from the bottom cap. See Fig 7

Fig. 8 - Setting key

Fig. 8 - silencer assembly (detail)

Fig. 9 Safety shutoff valve assembly (detail) 

Adjustment 

screw

Setting key

The setting key - ref. 20231000 -  
is provided on request.

Содержание RB 4000

Страница 1: ...RB 4000 Gas Pressure Regulator Gasdruckregelgerät 3400992804 AB Instruction Manual Betriebsanleitung GAS EN DE ...

Страница 2: ...w 19 Outlet Pressure Range 20 Installation exemple 21 Tools 22 Spare Part kits 23 INHALTSVERZEICHNIS SEITE Sicherheitshinweise 11 Beschreibung technische Daten 12 SAV 8500 Beschreibung Wiedereinrasten 13 SAV 8600 Beschreibung Wiedereinrasten 15 Einbau Anleitung 17 Inbetriebnahme 18 Instandhaltung 18 Annektieren 19 Schnittbild 19 Ausgangsdruckbereich 20 Beispielinstallation 21 Werkzeuge 22 Ersatzte...

Страница 3: ...3 EN ...

Страница 4: ...replaced The device must be cleaned with a wet cloth only Please don t use solvent or alcohol containing products to clean the regulator Before removing the regulator please depressurise completely Some gas may still be inside the regulator and the pipe therefore sufficient ventilation is required REMARKS FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES ATEX If film of rust is possible flying rust in ...

Страница 5: ...he sensing line 15 increase or decrease beyond the preset values thus moving from its balancing position In this action the SSV measurement diaphragm stem valve plug system switch The stem 18 connected to the valve disc 12 triggers under the force of the closing spring 13 the valve disc to the orifice 8 by cutting automatically the flow of gas SSV 8500 FOR RB 4000 MODELS WITH INTEGRATED SSV 8500 I...

Страница 6: ...eam stop valve Remove the cover 29 unscrewing it fig a Screw it upside down into the stem 28 until in comes into contact with the cover fig b Continue to screw it slowly with this operation by pass pressure fills the downstream pipe part Pull the cover outwards in order to permit the seating of the balls on the stem the shut off valve is reset fig c After these operations screw the cover to it is ...

Страница 7: ...the stem valve disc assembly 4 By effect of the force of the closing spring 7 the assembly 4 comes immediately into contact with the orifice 8 interrupts automatically the flow of gas SSV 8600 FOR RB 4000 MODELS WITH INTEGRATED SSV 8600 Item Description 1 Valve body 2 Control unit 3 Lever system 4 Stem valve disc assembly 5 control chamber 6 Diaphragm assembly 7 Closing spring 8 Valve seat Orifice...

Страница 8: ...plied with preset values according the order Should be necessary to modify the calibration value it must be considered that the modification can be effected only within the specific set range of the spring installed otherwise it is necessary to substitute with a suitable spring to be selected referring to the provided tables When the installed spring is appropriate to obtain the required pressure ...

Страница 9: ... gives a typical example of installation The downstream vent valve eases start up and changes in pressure setting The creep relief valve optional limits pressure surges example gas thermal expansion in case of downstream piping exposed to sun radiation at zero flow Outlet buffer volume In case of fast variations of gas demand ON OFF the response time of the regulator may cause transient pressure s...

Страница 10: ...quality of gas supplied in terms of moisture content liquid hydrocarbons and impurities in general and to the degree of filtration performed upstream of the pressure regulator For this reason we recommend always installing a cartridge filter upstream from the pressure regulator that is capable of withholding the solid and liquid particles present in the gas that might otherwise compromise efficien...

Страница 11: ...11 DE ...

Страница 12: ...endet werden Beim Austausch drucktragender Teile ist darauf zu achten dass diese der Druckgeräterichtlinie entsprechen Gewährleistung nur bei Reparatur durch Itron Bei Korrosionsgefahr im Innen und Außenbereich muss das Gerät regelmäßig untersucht werden und bei merklicher Korrosion aus dem Verkehr genommen werden Das Gerät darf nur mit einem feuchten Tuch gereinigt werden Zum Reinigen des Gerätes...

Страница 13: ...icht wird die Baugruppe Membrane 4 15 bewegt und das Kugelrast System entriegelt Die Ventilstange 18 gemeinsam mit dem Ventilteller 12 bewegt sich durch die Kraft der Sollwertfeder 13 und schließt im Zusammenwirken mit der Düse 8 den Gasstrom automatisch Hinweis die schematische Darstellung bezieht sich auf das SAV 8500 das Funktionsdesign wird ausserdem auch für die Baureihen 8200 und 8300 verwen...

Страница 14: ...die Schraubkappe 29 durch herausschrauben Fig a Schraube die Kappe über Kopf auf die Ventilstange 28 bis diese am Gehäuse anliegt Fig b Langsam weiter hereindrehen dadurch wird der Druckausgleich am Ventil hergestellt und der Ausgangsbereich gefüllt Ziehe die Schraubkappe heraus bis die Kugeln des Rast Systems die Ventilstange verriegeln Fig c Nach diesen Schritten wird die Schraubkappe in das Geh...

Страница 15: ...d die Ventiltellereinheit 4 wird geschlossen Aufgrund der Federkraft 7 wird die Ventiltellereinheit 4 gegen die Düse 8 gepresst und der Gas Durchfluss wird unterbrochen SAV 8600 RB 4000 AUSFÜHRUNG MIT INTEGRIERTEM SAV 8600 Item Beschreibung 1 Ventilkörper 2 Messwerk 3 Schaltgetriebe 4 Ventiltellereinheit 5 Vergleichermembrane 6 Membraneinheit 7 SAV Schließfeder 8 SAV Düse 9 Justierschraube 10 Just...

Страница 16: ...ung und der Ausgangshahn kann langsam geöffnet werden Justieren des SAV Messwerkes Das SAV ist ab Werk auf die in der Kundenbestellung vorgegeben Werte eingestellt Falls die Einstellwerte geändert werden bitte zuerst prüfen ob die neuen Werte mit den eingebauten Federbereichen realisiert werden können Anderenfalls vorher die geeignete Feder einbauen Unter der Voraussetzung der geigneten Feder bitt...

Страница 17: ...rgestellt Ein Entlüftungsventil im Ausgangsbereich vereinfacht die Inbetriebnahme und Neujustieren des Regelgerätes Das optionale Sicherheits Abblaseventil begrenzt Druckerhöhungen Beispiel Druckerhöhung durch Temperatureinfluss auf die Ausgangsleitung ohne Gasverbrauch Puffervolumen hinter dem Regelgerät Im Falle schneller Lastwechsel des Gasverbrauches Auf Zu kann die Reaktionszeit des Reglers z...

Страница 18: ...Grad der Filterung vor dem Regelgerät Aus diesem Grund empfehlen wir einen Filter mit auswechselbarem Filtereinsatz vor dem Regelgerät der in der Lage ist die festen und flüssigen Bestandteile aufzuhalten die ansonstendie Funktion des Gerätes beeinflussen könnten Unbedingt sicherstellen dass das Gerät komplett drucklos ist bevor Instandhaltungsmaßnahmen eingeleitet werden dazu bitte wie folgt vorg...

Страница 19: ...tmung Loading spring Sollwertfeder Actuator Stellantrieb Anti pumping valve Impulsdämpfung Sensing line Messleitung Valve disc Düse Valve seat Ventilteller Safety Shutoff valve SSV Sicherheitsabsperrventil SAV SSV Sensing line SAV Messleitung Diaphragm Membrane Fig 2 RB 4000 with built in safety shutoff valve RB 4000 mit integriertem SAV ...

Страница 20: ...243 11 Silver Silber 0 48 0 66 bar 0 70 1 02 bar 20568281 11 63 243 11 Purple Lila 0 65 0 82 bar 0 99 1 20 bar 20568286 11 5 63 243 10 8 Yellow Silver Gelb Silber 0 80 1 00 bar 1 18 1 55 bar 20568284 12 63 243 10 Red Silver Rot Silber 0 99 1 30 bar 1 50 2 00 bar DN 80 DN 100 Spring Code Feder Nr Spring Characteristic Feder Eigenschaften Colour Farbe Spring Range Federbereich d mm Di mm Lo mm Lt 40...

Страница 21: ...nitor regulator sensing line Messleitung Monitor Regler Downstream pressure gauge Ausgangsdruck Manometer Discharge vent pipe Entlüftungsanschluss Downstream valve Ausgangshahn INSTALLATION EXAMPLE BEISPIELINSTALLATION 1 2 3 4 5 6 9 11 1 2 3 4 8 6 7 5 9 10 11 12 14 13 12 14 13 Fig 6 Regulator installation Zeichnung 6 Regelgeräte Installationsbeispiel Diameter DN Diameter DN 4 x Diameter DN 4 x Dia...

Страница 22: ...hlussgröße DN25 DN40 50 and und 50x80 DN80 DN100 A 3 45 45 45 45 4 5 6 44 44 8 44 44 B 13 43 43 43 43 17 47 19 47 47 C 10 13 42 46 52 42 52 42 42 17 24 47 24 46 52 52 19 24 24 21 13 13 13 22 93 13 93 46 93 46 93 24 7 30 7 30 30 1 26 1 26 1 1 32 97 97 97 97 35 26 30 26 30 40 10 40 40 2 Tool A Werkzeug A Tool C UNI 6733 70 Werkzeug C Tool B UNI 6745 70 Werkzeug B O Ring removing tool O Ring Ausbring...

Страница 23: ... 4012 80 39827100 RBE 4020 4021 4022 80 39827200 RBE 4030 4031 4032 80 39827300 RBE 4040 4041 4042 80 39827100 RBE 4010 4011 4012 100 39829100 RBE 4020 4021 4022 100 39829200 RBE 4030 4031 4032 100 39829300 RBE 4040 4041 4042 100 39829400 Version SSV assembled Version SSV montiert DN Article N Artikel Nr 8511 8512 25 39883110 8521 8522 25 39883210 8531 8532 25 39883310 8541 8542 25 8511 8512 40 39...

Страница 24: ...22 40 39871220 8631 8632 40 39871320 8641 8642 40 39871420 8611 8612 50 39872120 8621 8622 50 39872220 8631 8632 50 39872320 8641 8642 50 39872420 8611 8612 80 39874120 8621 8622 80 39874220 8631 8632 80 39874320 8641 8642 80 39874420 While Itron strives to make the content of its marketing materials as timely and accurate as possible Itron makes no claims promises or guarantees about the accuracy...

Отзывы: