background image

 

 

 

 
 
 
 
 

 

 

 

INSTRUCTIONS FOR MEASURE-TAKING AND INSTALLATION 

Instruction validity: as of 1 August 2013 

3. WIRING 

 
Versions of the recommended positioning of the electrical cable 
 

 

(5) - rear outlet 

 

(6) - side outlet 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

  
 

3.1 CABLE INNER LEAD 

 
 

Содержание SELF-SUPPORTING BLIND, UPROLLING OUTSIDE THE CHANNE

Страница 1: ...ANNEL 1 MEASURE TAKING Measure taking applies to width W and height H of the opening The blind width should be measured in three points atop in the middle and at the bottom For manufacture and order t...

Страница 2: ...CTIONS FOR MEASURE TAKING AND INSTALLATION Instruction validity as of 1 August 2013 3 WIRING Versions of the recommended positioning of the electrical cable 5 rear outlet 6 side outlet 3 1 CABLE INNER...

Страница 3: ...nd secure the box in the reveal 7 box attachment 5 SCREEN ADJUSTMENT Pull the lower profile with the screen down under the plastic guiding components at the top of the guide bars and then in an inclin...

Страница 4: ...TAKING AND INSTALLATION Instruction validity as of 1 August 2013 6 SLAT MOUNTING Slide the slat packet 4 into the blind suspensions 10 7 SECURING THE PACKET Turn the spring to lock the system against...

Страница 5: ...truction validity as of 1 August 2013 7 1 LOCKED PACKET Spring clicked in the slot 8 ELECTRICAL INSTALLATION RECOMMENDED METHOD Couple the connectors 13 lead the cable on the upper side of the channel...

Страница 6: ...lidity as of 1 August 2013 9 FIXING THE BLIND GUIDE BARS Slide the blind guide bar 14 into the guide pieces 15 10 LOCKING THE GUIDE BARS Use screw 16 to attach the blind guide bar to the basic guide b...

Страница 7: ...UCTIONS FOR MEASURE TAKING AND INSTALLATION Instruction validity as of 1 August 2013 11 FIXING THE REVISION COVER 17 revision cover 11 1 ATTACHMENT OF THE REVISION COVER Use screw 18 with a plastic wa...

Страница 8: ...INSTRUCTIONS FOR MEASURE TAKING AND INSTALLATION Instruction validity as of 1 August 2013 11 2 FIXING A SCREW CAP Fix cap 19 to the screw head 12 FUNCTIONALITY CHECK...

Страница 9: ...preventing eventual problems Please inform the manufacturer of any deficiencies and or notes regarding the assembly or the blind as such ASSEMBLY TOOLS 1 Tape measure 2 Spirit level 3 Pencil 4 Hammer...

Отзывы: