
10.11 Test Log
Identical to the Event Log with the exception that the Test Log is only stored when a
system test is either:
a) initiated from either a manual process of the User pressing the Test Button on the
front panel keypad or,
b) when the system is instructed by the automatic monthly or yearly test.
10.12 Alarm Log
In the event an alarm occurs from one of many that the system can produce, this
alarm is immediately stored into memory. The alarm log has a record of any and all
alarms the system has experienced and is valuable for troubleshooting and detecting
issues. The Alarm Log is stored in a First in
–
First out process just like the other logs and
has the capability of storing up to 1000 alarms.
10.13 User Menu
From the Scrolling Home Pages, press Enter Key and down arrow to select User Menu
and press Enter to get to the password entry screen.
The User Password is 4 keystrokes
- Left Key, Right Key, Left Key, and Right Key.
Upon successful password keystrokes, the
User Menu is accessible and now several alarms can be turned on/off and threshold
levels for these alarms can be changed. If the password keystroke was not successful,
the Enter Password will be prompted again and the user has the option of going back
with the left key to try again.
Date and Time
The date and time is preset from the Factory (East Coast Time), user adjustable and
battery backed up. The Date and Time are extremely accurate and have a couple second
per year gain/loss accuracy. All Test, Event and Alarm Logs are time stamped from the
machines date and time settings. Furthermore, all Month and Year Tests are
synchronized to the machines date and time settings, so it is imperative that the correct
date and time are set. Daylight savings time is not compensated for so in the event your
area observes daylight savings time, please change the machines time for most accurate
settings.
Month Test
Per the NFPA and UL requirements, a system test of the Emergency Lighting
equipment should be performed once per month. Which Day of the month and what
time of day are fully adjustable. Factory default is First Day of month at 8:30 AM the test
will be performed.
Year Test
In addition to the Month Test requirements of the NFPA and UL, it is mandated that a
90-minute discharge be performed once per year. The Month, Day and Time of this test
is fully adjustable and the Factory default for this test is off. If the Yearly test is enabled,
the system will undergo a full 90-minute discharge test at the time and date determined
by the settings.
32
| INSTALLATION / OPERATION MANUAL
Содержание E3-MAC Series
Страница 8: ...SIZE 2 1 6KW thru 3 0KW Models 8 INSTALLATION OPERATION MANUAL...
Страница 9: ...SIZE 3 4 0KW thru 6 0KW Models E3 MAC SERIES 9...
Страница 10: ...SIZE 4 8 0 KW thru 12 5 KW Models 10 INSTALLATION OPERATION MANUAL...
Страница 19: ...2 2 KW 4 0 KW MODELS 2 8 KW 5 0 KW MODELS 1 6 KW MODEL E3 MAC SERIES 19...
Страница 20: ...3 0 KW 6 0 KW MODELS 8 0 KW MODEL 20 INSTALLATION OPERATION MANUAL...
Страница 21: ...10 0 KW MODEL 12 5 KW MODEL E3 MAC SERIES 21...
Страница 26: ...Table 8 2 Battery Electrolyte Volume Diagram 8 3 System One Line Drawing 26 INSTALLATION OPERATION MANUAL...
Страница 27: ...E3 MAC SERIES 27...