- 23 -
START UP CHECKLIST
Note: Units are to be installed and checked for proper function by qualified service personnel ONLY.
Check the following:
•
Unit is installed in compliance with all codes
and ordinances.
•
Circuit breakers and receptacles are correct.
•
Filter clean and in place.
•
All panels in place.
•
Condenser coil inlet and outlet free of
obstructions, and is sealed to louver.
•
Unit is properly sealed in sleeve.
•
Evaporator air inlet and outlet is free from
obstructions and properly sealed.
•
Smoke and odor can occur on initial use
of the heating element due to processing
residue and/or oil on the element. Leave the
area serviced by the unit until it is ventilated
of the smoke and odor by opening doors and
windows.
•
Control operation OK.
•
Owner or operator instructed on control op-
eration and routine maintenance.
•
Work area clean and free of debris.
•
Operate unit 20 minutes.
Содержание EZ Series 25
Страница 11: ... 8 ...
Страница 13: ... 10 ...
Страница 36: ...Fill in information below Model Serial Part Date of Start Up Installing Company Telephone ...