Unpack & Inspect

1

You should have:

•   1 Radiator

•   1 Airvent (pre-fitted) (B) 

•   1 Blanking Plug (pre-fitted) (C)

•   1 Diverter (pre-fitted) (D)

•   4 Bracket Caps (L) 

•   4 Bracket Screws (I)

•   4 Brackets (H) 

•   4 Support Plates (G) 

•   8 Wall Plugs and Screws (F+E)

Contents

2

Mark and Fix  Brackets

4

Diagrams of Ovali

The Radiator Company prides itself on selecting products from 

manufacturers who exercise tight quality control measures. We only 

select models with excellent standards of welding and brazing, as well 

as high quality finishes. All of our products are well packaged and 

should reach you in perfect condition. Just in case however, we offer 

a minimum 5-year no quibble guarantee for all 

radiators and towel rails. 

The Radiator Company must be notified of any 

shortages or damage within 28 days of delivery. 

For further information please see terms and 

conditions on back page.

PLEASE NOTE : 

It is essential that all brackets are level to ensure a 

vertical alignment for connecting the pipework.

Pipe Centres

Pipe centres left to right

Pipe centres from wall

Depth from wall

Commission

5

Please Note: 

In  accordance  with  Part  L1  2006  of  the  Building  Regulations  and 

BS7593:1992  code  of  practice  for  the  treatment  of  hot  water  and 

central heating systems, we strongly recommend flushing the heating 

system post installation of new radiators and then adding the correct 

quantity and type of inhibitor for use with your radiator and system 

to prevent corrosion. Damage caused to systems not protected by 

a suitable inhibitor will not be covered by manufacturer’s guarantee. 

Width + Valves

36mm

124mm

36

124

 1. The airvent “B” and the blanking plug “C” are already fitted on 

the radiator. 

2. The Diverter “D” and blanking plug “C” are already installed 

on the lower collector in the radiator. Please Note: The diverter is 

identified by the Yellow Cap “M”.  If you would like to move change 

the position of the Diverter please see section ‘3’. 

3. Accurately mark bracket holes on the wall using a tape measure 

and

spirit level. (Height of the radiator from floor : minimum 100mm)  

 

4. Drill 8mm diameter holes to a minimum depth of 50 mm,

and insert wall plugs “E”.  

 

5. Place the support plates “G” on the wall in line with the wall plugs 

and secure using screws “F”  

6. Insert the brackets “H” into the support plates “G”, and secure 

and level with screws “I”. Fit the bracket closing cap “L” on top. 

7. Hang the radiator on the first space of the brackets (please see 

diagram above) and ensure the radiator is level using a spirit level.  

Please refer to diagrams opposite when following steps below:

You will need:

• Tape measure

• Electric drill and bits

• Spirit level 

• Flathead screwdriver

• Crosshead screwdriver

Please Note: The wall plugs and screws supplied will not be 

suitable for all wall types. Please ensure suitable wall plugs and 

screws are used.

Identifying the Diverter

3

The pre-fitted diverter is marked with a yellow cap on the left hand side 

of the bottom collector. If the diverter needs to moved, firstly unscrew 

the diverter “D” on the left hand side, and the blanking plug “C” on the 

right hand side of the bottom collector. (Please see diagram opposite) 

 

Swap these round so that the Diverter “D” is now on the right hand side, 

and the Blanking Plug “C” is on the left, then screw in securely.

A

c

D

c

M

E

F

G

L

b

H

I

Place brackets on the outside  

holes for maximum support