Unpack & Inspect
1
Contents
2
Hanging the Radiator
4
Drawing 1 - Fixing positions for brackets
The Radiator Company prides itself on selecting products from
manufacturers who exercise tight quality control measures. We
only select models with excellent standards of welding and
brazing, as well as high quality finishes. All of our products are well
packaged and should reach you in perfect condition. Just in case
however, we offer a minimum 5-year no quibble
guarantee for all radiators and towel rails.
The Radiator Company must be notified of
any shortages or damage within 28 days of
delivery. For further information please see
terms and conditions on back page.
Pipe Centres
Pipe centres left to right
Pipe centres from wall
Depth from wall
Commission
5
Please Note:
In accordance with Part L1 2006 of the Building Regulations
and BS7593:1992 code of practice for the treatment of hot
water and central heating systems, we strongly recommend
flushing the heating system post installation of new radiators
and then adding the correct quantity and type of inhibitor
for use with your radiator and system to prevent corrosion.
Damage caused to systems not protected by a suitable
inhibitor will not be covered by manufacturer’s guarantee.
Width + Valves
38mm - 52mm
111mm - 121mm
Please refer to diagrams opposite when following steps below:
Identifying the Diverter
3
Insert the rubber diverter inside the bottom collector on the flow
side. Using a hex key press approx. 150 mm into the collector (Note
the bottom collector has no hole drilled for the air vent).
.
Fig.1 Bracket Positions (mm)
You will need:
• Tape measure
• Electric drill and bits
• Spirit level
• Airvent key
• Appropriate wall fixings
• Spanner for valves & vents
You should have:
•
1 Radiator
• 4 Brackets
• 2 Blanking plugs
• 1 airvent
• 1 Rubber Diverter
1.
Accurately mark bracket holes on the wall using a tape
measure and spirit level. The bracket centres are positioned
43mm down from the top of the radiator, and 82.5mm in from
either side. (Height of the radiator from floor: minimum 100mm)
2.
Drill holes using suitable drill bits and plugs, insert suitable
wall plugs. To hang the top two brackets, secure the backplate
‘A’ with screws ‘B’ (or other suitable screws) going through into
the wall plugs.
3
. Select the pipe distance from wall using options 1A,1B,2A or
2B and Insert the brackets ‘C’ down into the back plate ‘A’ and
secure with the provided screw ‘D’. Then fit the closing cap ‘E’
on top.
4.
Hang the radiator and mark the bottom on the wall, take
down the radiator and fit the bottom two brackets with back
plate centred 14mm above the mark (Note the bottom back
plate will be below the radiator) Using the same option as used
on top brackets regarding distance from wall repeat “3”
82,5
82,5
46
14
b
Fig 3. Bracket Hanging measurements
45,76
50,56
Fig 2. Bracket Hanging options
Option. 1
Option. 2
Option. 1
12,05
9,75
A
B
4 pz.
C
D
E
A
B
40,75
35,95
Option. 2A
Option. 1A
Option. 2B
Option. 1B
43
10,50
11,50
47,30
51,50
36,50
41,30