background image

Unpack & Inspect

1

Contents

2

Hanging the Radiator

4

Drawing 1 - Fixing positions for brackets

The Radiator Company prides itself on selecting products from 
manufacturers who exercise tight quality control measures. We 
only select models with excellent standards of welding and 
brazing, as well as high quality finishes. All of our products are well 
packaged and should reach you in perfect condition. Just in case 

however, we offer a minimum 5-year no quibble 
guarantee for all radiators and towel rails. 

The Radiator Company must be notified of 
any shortages or damage within 28 days of 
delivery. For further information please see 
terms and conditions on back page.

Pipe Centres

Pipe centres left to right

Pipe centres from wall

Depth from wall

Commission

5

Please Note: 
In accordance with Part L1 2006 of the Building Regulations 
and BS7593:1992 code of practice for the treatment of hot 
water and central heating systems, we strongly recommend 
flushing the heating system post installation of new radiators 
and then adding the correct quantity and type of inhibitor 
for use with your radiator and system to prevent corrosion. 
Damage caused to systems not protected by a suitable 
inhibitor will not be covered by manufacturer’s guarantee.

Width + Valves

38mm - 52mm

111mm - 121mm

Please refer to diagrams opposite when following steps below:

Identifying the Diverter

3

Insert the rubber diverter inside the bottom collector on the flow 
side. Using a hex key press approx. 150 mm into the collector (Note 
the bottom collector has no hole drilled for the air vent). 

.

Fig.1 Bracket Positions (mm)

You will need: 

•  Tape measure
•  Electric drill and bits
•  Spirit level 
•  Airvent key

•  Appropriate wall fixings

•  Spanner for valves & vents

You should have:

 

• 

  1 Radiator

•  4 Brackets
•  2 Blanking plugs
•  1 airvent 

•  1 Rubber Diverter 

1.

 Accurately mark bracket holes on the wall using a tape 

measure and spirit level. The bracket centres are positioned 
43mm down from the top of the radiator, and 82.5mm in from 
either side. (Height of the radiator from floor: minimum 100mm)

2.

 Drill holes using suitable drill bits and plugs, insert suitable  

wall plugs. To hang the top two brackets, secure the backplate 
‘A’ with screws ‘B’ (or other suitable screws) going through into 
the wall plugs.

3

. Select the pipe distance from wall using options 1A,1B,2A or 

2B and Insert the brackets ‘C’ down into the back plate ‘A’ and 
secure with the provided screw ‘D’. Then fit the closing cap ‘E’ 
on top.

4.

 Hang the radiator and mark the bottom on the wall, take 

down the radiator and fit the bottom two brackets with back 
plate centred 14mm above the mark (Note the bottom back 
plate will be below the radiator) Using the same option as used 
on top brackets regarding distance from wall repeat “3”

82,5

82,5

46

14

b

Fig 3. Bracket Hanging measurements

45,76

50,56

Fig 2. Bracket Hanging options

Option. 1

Option. 2

Option. 1

12,05

9,75

A

B

4 pz.

C

D

E

A

B

40,75

35,95

Option. 2A

Option. 1A

Option. 2B

Option. 1B

43

10,50

11,50

47,30

51,50

36,50

41,30

Отзывы: