Ironkids 8103 Скачать руководство пользователя страница 42

41

Step 24 

Insert 

the two Long Plastic Sticks 

H3 into the holes on 

the Sunshade 

H1.

Insert 

the Short Plastic Stick 

H2 into the holes on 

the Sunshade 

H1.

Содержание 8103

Страница 1: ...ONMAN TRIATHLON and M DOT are registered trademarks of World Triathlon Corporation This product is licensed by the IRONMAN TRIATHLON CAUTION This unit is designed to be used safely by up to 6 children between the ages of 3 years to 8 years old with a maximum weight of 80 pounds 36 3kgs each simultaneously not to exceed a combined weight of 480 pounds 218kgs ...

Страница 2: ...1 8103 3 060716 ...

Страница 3: ...il us at service paradigmhw com Please visit our website at www paradigmhw com Please have the following information ready when requesting for service Your name Phone number Model number Serial number Part number Proof of Purchase Before returning this product to the store please contact customer service at the contact number Paradigm Health Wellness Inc 1189 Jellick Ave City of Industry CA 91748 ...

Страница 4: ...mportant Labels 4 Important Safety Precautions 5 Tools Required for Assembly 6 Hardware for Assembly 7 Parts Numbers and Illustrations 11 Overview Drawing 22 Assembly Instructions 23 Ground Anchor Installation 42 Parts Request Form 45 ...

Страница 5: ... act of Nature such as fire flooding snow ice hurricane earthquake lightning or other natural disaster environmental condition such as air pollution mold mildew etc or staining from foreign substances such as dirt grease oil etc 6 Normal weathering due to exposure to sunlight weather and atmosphere which can cause colored surfaces to among other things flake chalk accumulate dirt or stains 7 Impro...

Страница 6: ...5 IMPORTANT LABELS ...

Страница 7: ...twist the chains on the swing or loop them over the top bar This may reduce the strength of the chain 14 Teach and instruct children not to swing empty seats 15 Instruct children how to sit in the center of the seats and swing with their full weight on the seat 16 Warn children not to use the equipment in any manner other than intended 17 Warn children not to get off the rides while in motion 18 W...

Страница 8: ...hat all nuts and bolts are checked prior to the first use each season TOOLS REQUIRED FOR ASSEMBLY Please prepare the following tools prior to assemble this equipment Special Socket Wrench Included Tape Measure Hammer Wrench Included Phillips Screwdriver Allen Wrench with Phillips Screwdriver M5 Included Spring Loading Included Allen Wrench M5 Included ...

Страница 9: ...main frame assembly Binder Post Bolt Set Preassembled M8x15 Bolt Ø10x50 Sleeve Nut 4 SETS Aa1 Aa2 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x50 Sleeve Nut 8 SETS M6x15 Bolt Set Preassembled 2 SETS Aa3 Aa4 M6x60 Bolt Set Preassembled 8 SETS ...

Страница 10: ... Binder Post Bolt Set Preassembled M8x15 Bolt Ø10x52 Sleeve Nut 2 SETS Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x56 Sleeve Nut 2 SETS Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x52 Sleeve Nut 5 SETS Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x50 Sleeve Nut 2 SETS Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x38 Sleeve Nut 2 SETS ...

Страница 11: ...sher Nut Set Preassembled Ø16xØ8x1 5 Washer M8 Nut 1 SET M6x40 Bolt Set Preassembled 4 SETS Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x52 Sleeve Nut 2 SETS Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x26 Sleeve Nut 2 SETS M6x32 Bolt Set Preassembled 2 SETS ...

Страница 12: ...11 Hardware used for slide assembly M6x36 Bolt Set Preassembled 4 SETS Za1 Za2 M6x42 Bolt Set 4 SETS Za3 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x24 Sleeve Nut 10 SETS ...

Страница 13: ...used for main frame assembly A1 C P 1 I I I r a B p o T A2 C P 1 I I r a B p o T A8 Ground Anchor 9 PCS A9 Plastic Stick Holder 2 PCS A10 Plastic Stick Holder 2 PCS A11 Plastic Stick Holder 2 PCS A12 Top Bar III 1 PC 1 PC Leg A13 A13A 1 PC Leg ...

Страница 14: ... M8x15 Bolt Ø10x50 Sleeve Nut 4 SETS Aa2 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x50 Sleeve Nut 8 SETS Aa3 M6x15 Bolt Set Preassembled 2 SETS Aa4 M6x60 Bolt Set Preassembled 8 SETS A14 1 PC Leg A14A 1 PC Leg 1 PC Cross Bar A15 1 PC Connect Bar A16 2 PCS Protective Net A17 ...

Страница 15: ... E1 Trapeze Ring Hanger Handle Preassembled 2 SETS E2 Trapeze Ring Tube 1 PC E3 Cap for Trapeze Ring Tube Preassembled 2 PCS Ea1 Sleeve Nut Set Preassembled 2 SETS Ea2 Eye Bolt Set Preassembled 2 SETS Ea3 Screw Hook Preassembled 2 PCS Ea4 Cap Nut Set Preassembled 2 SETS ...

Страница 16: ...y Hardware used for swing seats assembly J1 Swing Ring 4 PCS J2 Swing Seat 2 PCS Ja1 Sleeve Nut Set Preassembled 4 SETS Ja2 Eye Bolt Set Preassembled 4 SETS Ja3 Screw Hook Preassembled 4 PCS Ja4 Screw Hook Cap Set Preassembled 4 SETS ...

Страница 17: ...d roundabout assembly D1 Connecting Bar 1 PC D2 Main Spinning Bar 1 PC D3 Base Bar 1 PC D4 Connecting Bar 1 PC D5 Connecting Bar 1 PC D6 Connecting Bar 1 PC D7 Connecting Bar 1 PC D8 Supporting Bracket 2 PCS D9 Spinning Disk 1 PC ...

Страница 18: ...ut 2 SETS Da3 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x56 Sleeve Nut 2 SETS Da4 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x52 Sleeve Nut 5 SETS Da5 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x50 Sleeve Nut 2 SETS Da6 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x38 Sleeve Nut 2 SETS Da7 M6x40 Bolt Set Preassembled 4 SETS Da8 Washer Nut Set Preassembled Ø20xØ8x2 0 Washer M8 Nut 1 ...

Страница 19: ...Bar Preassembled 1 PC T1 Spring 28 PCS T2 C P 1 t a M p m u J C P 1 d a P e m a r F 3 T T4A L Shaped Tube Left 1 PC T4B L Shaped Tube Right 1 PC T5 Straight tube 1 PC C P 1 m a o F h t i w r a b e l d n a H 6 T C P 1 t f e L e b u T e s a B r a b e l d n a H A 7 T ...

Страница 20: ... Tube 1 PC T9 Handlebar Base Tube End Cap Preassembled 2 PCS T10 Elbow Tube End Cap Preassembled 2 PCS Ta1 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x52 Sleeve Nut 2 SETS Ta2 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x26 Sleeve Nut 2 SETS Ta3 M6x32 Bolt Set Preassembled 2 SETS ...

Страница 21: ... d i l S 3 Z S C P 2 p e t S r e d d a L e d i l S 4 Z S C P 2 e t a l P g n i t c e n n o C 5 Z S C P 2 d e l b m e s s a e r P 2 Z d n a 1 Z r o f p a C 6 Z S C P 2 d e l b m e s s a e r P 3 Z r o f p a C 7 Z C P 1 e d i l S 8 Z r o p p u S r e d d a L e d i l S 9 Z t Tube Cross Bar 2 PCS C P 1 r a B s s o r C g e L e d i l S 0 1 Z ...

Страница 22: ... Preassembled 4 SETS M6x42 Bolt Set 4 SETS Za3 Binder Post Bolt Set Preassembled M6x12 Bolt Ø8x24 Sleeve Nut 10 SETS Parts used for shade assembly H1 Sunshade 1 PC H2 Short Plastic Stick 2 PCS H3 Long Plastic Stick 2 PCS H4 Logo 1 PC H5 2 PCS Plastic Connector ...

Страница 23: ...D5 D6 D7 D8 D8 D9 T9 T10 D10 Ea2 Ea1 Ea1 Ja1 Ja1 Ea4 Ea3 Ja3 Ja4 Ja2 Ja2 Ja1 Ja2 Ja1 Ja2 Ja3 Ja4 Aa1 Aa1 Aa3 Aa3 Aa4 Aa4 Aa2 Aa2 Aa2 Aa2 Aa2 Aa2 Aa4 Aa4 Aa2 Aa2 Da1 Da4 Da5 Da5 Da6 Da7 Da8 Da9 Da2 Da3 Da4 Ta3 Ta3 Ta2 Ta1 Ta2 Ta1 Da10 Da4 J1 J1 J1 J1 J2 J2 H4 H3 H3 H2 H1 H2 H5 H5 Za2 Za1 Za1 Za3 Za3 Z4 Z5 Z1 Z2 Z5 Z4 Z7 Z8 Z7 Z6 Z6 Z9 Z3 Z3 Z9 Z10 Za2 Za3 Za3 Za3 Za3 Za3 Za3 Za2 Za2 ...

Страница 24: ... hard surface A fall onto a hard surface can result in serious injury to the user TIGHTENING NUTS BOLTS Do not over tighten the nuts and bolts when you are assembling your playground equipment This will allow for some possible adjustments and ease of installation Once you have completed the assembly of the playground equipment go back over all of the nuts and bolts and properly tighten all of them...

Страница 25: ...nto the socket of Top Bar I A1 secure with the two sets of Pre installed Hardware Aa1 that were removed Remove one set of Pre installed Hardware Aa3 from the Top Bar II A2 Attach the Plastic Stick Holder A9 onto the Top Bar II A2 with the set of Pre installed Hardware Aa3 that was removed Remove two sets of Pre installed Hardware Aa1 from Top Bar II A2 Insert the small end of Top Bar III A12 into ...

Страница 26: ...13A Attach the Cross Bar A15 onto the Legs A13 and A13A with the two sets of Pre installed Hardware Aa2 that were removed Remove two sets of Pre installed Hardware Aa4 from the Leg A13A Attach the Plastic Stick Holder A10 onto the Leg A13A with the two sets of Pre installed Hardware Aa4 that were removed Remove two sets of Pre installed Hardware Aa4 from the Leg A13 Attach a Plastic Stick Holder A...

Страница 27: ...nd A14A Attach the Cross Bar A16 onto the Legs A14 and A14A with the two sets of Pre installed Hardware Aa2 that were removed Remove two sets of Pre installed Hardware Aa4 from the Leg A14A Attach a Plastic Stick Holder A11 onto the Leg A14A with the two sets of Pre installed Hardware Aa14 that were removed Remove two sets of Pre installed Hardware Aa4 from the Leg A14 Attach a Plastic Stick Holde...

Страница 28: ...7 Step 4 Attach a Protective Net A17 onto the Legs A13 A13A and Cross Bar A15 with Velcro straps A13A A15 A13 Step 5 Attach a Protective Net A17 onto the Legs A14 A14A and Cross Bar A16with Velcro straps ...

Страница 29: ...28 Step 6 Hang the Swing Chains J1 in place from the Eye Bolts Ja2 on the Top Bar III A12 Step 7 Hang both Trapeze Ring Hanger Handles E1 in place from the Eye Bolts Ea2 on the Top Bar III A12 ...

Страница 30: ...d D7 onto Legs A14 A14A and Connecting Bar D1 with the two sets of Pre installed Hardware Da5 and one set of Pre installed Hardware Da4 that were removed Step 9 Remove four sets of Pre installed Hardware Da7 Remove two sets of Pre installed Hardware Da6 Insert the Main Spinning Bar D2 into the hole on the Spinning Disk D9 Insert the Base Bar D3 into Main Spinning Bar D2 Attach both Supporting Brac...

Страница 31: ...D2 Attach Da9 and D10 onto the top end of D2 with one set of Da8 that was removed Remove two sets of Da2 from D1 Attach D10 onto D1 with two sets of Da2 that were removed USE SPECIAL SOCKET WRENCH AND SCREWDRIVER TO TIGHTEN the Hardware Da8 ...

Страница 32: ...r D3 with the two sets of Pre installed Hardware Da3 that were removed Remove four sets of Pre installed Hardware Da4 from the Legs A14 and A1A Attach the other end of the Connecting Bars D4 and D5 onto Legs A14 and A14A with the four sets of Pre installed Hardware Da4 that were removed TIGHTEN ALL BOLTS ON THE PLAYGROUND ...

Страница 33: ...re removed Step 13 Remove two sets of Pre installed Hardware Ta1 and Ta2 Align the Handlebar Base Tube Left T7A to the outside of the L Shaped Tube Left T4A and put the Handlebar Base Tube Right T7B to the outside of the L Shaped Tube Right T4B align the holes Secure using the two sets of Pre installed Hardware Ta1 for the upper hole of the Handlebar Base Tube Left T7A and Handlebar Base Tube Righ...

Страница 34: ... Keep springs dry wet springs are very slippery Attach a Spring T1 with spring hooks a face down to the triangle ring of the mat Hold the srping loading tool underhand and pull spring hook b towards the hole on the frame as shown in detailed drawing Drop hook into the frame hole until it latches on ...

Страница 35: ...d T3 over the trampoline so that the springs and the steel frame are covered ensure that the Frame Pad T3 covers all metal parts Step 16 Insert the Handlebar with Foam T6 onto the small end of the Handlebar Base Tube Left T7A and Handlebar Base Tube Right T7B TIGHTEN ALL HARDWARE AT THIS TIME ...

Страница 36: ...fits securely on the trampoline Line up the elastic straps over the main frames T4A T4B T8A and T5 of the trampoline aligning alternate straps over and then tie the straps as shown drawing B Make sure every strap is tied well Turn the four Anchors A8 into the ground until only the hooked end is above the ground next to the Handlebar Base Tube Left T7A Handlebar Base Tube Right T7B and Elbow Tube T...

Страница 37: ...or Playground 1 Do not place the trampoline in front or back of the swing set to avoid injuries from collisions 2 Only place the trampoline at the side of swing set and keep at least 6 feet of distance between them ...

Страница 38: ... Head Bolt sets Za1 from the Slide Ladder Support Tube Z1 and Slide Ladder Connecting Tube Z2 Insert the longer ends of the Slide Ladder Support Tube Z1 and Slide Ladder Connecting Tube Z2 into the holes on the rear end of the Slide Z8 and align the holes Insert both Slide Leg Tubes Z3 into the holes on the front end of the Slide Z8 and align the holes Secure the Slide Z8 using the 4 sets of Hardw...

Страница 39: ...of the Slide Ladder Steps Z4 with the TOP and BOTTOM set of holes on the Slide Ladder Support Tube Z1 and Slide Ladder Connecting Tube Z2 Secure the Slide Ladder Steps Z4 using the four sets of Hardware Za2 previously removed Remove two sets of preinstalled Hardware Za3 from the two Connecting Plates Z5 Attach both Connecting Plates Z5 to the Slide Mounting Bar A15 with the two removed sets of Har...

Страница 40: ...39 Step 22 2 Za3 Za3 Z2 Z5 Attach the Slide Ladder Connecting Tube Z2 onto the Cross Bar A15 using the two Connecting Plates Z5 and the two sets of Hardware Za3 that was previously removed ...

Страница 41: ...rs Z9 Attach one Slide Ladder Support Tube Cross Bar Z9 onto each side of the ladder using the hardware sets Za3 that were removed Remove two sets of Hardware Za3 from the Slide Leg Cross bar Z10 Attach the Slide Leg Cross Bar Z3 to the slide using the two sets of Hardware Za3 that were removed SECURELY TIGTHEN ALL BOLTS ON THE SLIDE ...

Страница 42: ...41 Step 24 Insert the two Long Plastic Sticks H3 into the holes on the Sunshade H1 Insert the Short Plastic Stick H2 into the holes on the Sunshade H1 ...

Страница 43: ...site Long Plastic Stick H3 into the hole of the Plastic Stick Holder A10 on the Leg A13A and the other end of the Long Plastic Stick H3 into the hole of the Plastic Stick Holder A11 on the Leg A14A Insert the two Short Plastic Sticks H2 into the holes on the Plastic Stick Holder A9 Attach all Velcro straps onto frame Attach the two Plastic Connectors H5 with the Logo H4 onto the two Short Plastic ...

Страница 44: ...ent space remains under the swings Be certain that all anchoring devices including concrete are placed below the level of the playing surface or below ground level to prevent tripping Be sure the swing set is located on level ground For Soil Ground Installation Turn the corkscrew anchor into the ground until only the hooked end is above the ground next to the leg Insert the hooked end into the bot...

Страница 45: ...out 45lb of concrete per leg Cover concrete with dirt and protective surface material Allow about 6 7 days for concrete to dry properly Note The maximum fall height for this product is 6 feet The minimum ground clearance between the bottom of the suspended plays and the playing or ground service must be 8 inches Must keep a minimum 8 inches of space with the soil Warning Please bury the legs of th...

Страница 46: ..._ TELEPHONE Day ____________________________________________ Night ____________________________________________ SERIAL _____________________________________________________ MODEL _____________________________________________________ PURCHASE DATE _____________________________________________ PLACE OF PURCHASE _________________________________________ YOUR ORDER WILL BE PROCESSED WITHIN 3 BUSINESS ...

Отзывы: