background image

AC

AD

AE

AF

ASSEMBLY

STEP 4
Align main top to assembled shell.

STEP 5
Align return top to assembled shell and secure with 
lag bolts like step 4.

STEP 6
Align transaction screen to main 
top.

Secure transaction screen to main top
with lag bolts using a #3 square drive.

1

TS2

*Depending on your transaction counter configuration you may have 
additional transaction screens to secure to main top.

M1

1

Secure main top to assembled shell
with lag bolts using a #3 square drive.

R1

Secure main top and return top together with
a splice plate at connection and lag bolts.

A

1

TS2

M1

Отзывы: