7)
You may require an additional adjustment by moving the individual vanes
when the condition of fertilizer changes(weight, condition(wet or dry), etc)
Moving the vane tips forward(No.1) will carry more material to the
lefthand side.
Moving the vane tips backward(No.3) will carry more material to be
spread to the righthand side.
Please have a test spreading after each adjustment.
- 5 -
Содержание IJS-200
Страница 15: ...3 Frame Parts Layout 13 ...
Страница 20: ...C Fix the gear box on the proper bracket of the frame by 6 SCREWS 8x25 6 LOCK NUTS D Tighten 18 ...
Страница 29: ...IJS 340 27 ...
Страница 30: ...12 2 Assembling instructions for Electric Control 1 Frame 2 Gear lever and DC motor 28 ...
Страница 31: ...A Paint the grease on the hole left side and right side 29 ...
Страница 38: ...X Set gage pin on gage level and tighten Closing Y Tighten DC motor cover 36 ...
Страница 44: ...Warranty Execution Report DATE PERFORMED TECHNICIAN CONFIRMED ...