QUICK START
6. Unbonding
Unbonding a Node
on the Coordinator side
•
Select the desired address of the Node in the
Address
field (IQMESH Network Manager – the
Control
→
IQMESH
tab).
•
If the network is not created yet or given Node is not reachable, activate the
Only in Coordinator
checkbox.
•
Click the
Unbond Node
button.
Unbonding a Node
on the Node side
•
Press and hold button
SW1
(close to USB connector).
•
Shortly press button
SW2
. Green LED shines for about 2 s.
•
Release the
SW1
button immediately once the green LED stops shining.
•
If the node is successfully unbonded, red LED is flashing and module falls asleep after 10 s.
Note
Besides of
IQMESH Network Manager
and
DPA Test
, IQRF IDE provides also further tools (
Terminal Log
and
Packet
Inspector
) for working with DPA especially for developers implementing or testing the DPA protocol. They are described in
IQRF IDE Help.
© 2015 MICRORISC s.r.o.
www.iqrf.org
Quick_Start_Guide_IQRF_ 150805
Page 16