Node B Installation Guide
Version 5.0.0
Page 11 of 15
Step 2 – Parts Shipped & Tools Required
This section reviews the parts, ancillary materials and tools required to install the Node B.
Use this checklist to check quantity and quality of parts as they are unpacked: -
The Node B unit is packaged with the following items, the packing list on the inside top of the
packing shall list these items.
The carton is packed to facilitate the intended sequence of installation. The figure below
shows the sequence of removal from the packing.
Table 6-1 : Packing List
#
Description
Qty
1
Node B Unit
1
2
Node B Mounting Bracket
1
3
Solar Shield Assembly
1
4
Unit Mounting Bracket Fixings Kit
contains:
4 x M8 bolts
1
5
GPS Antenna Kit incl Mounting
contains:
1 x gps antenna
1 x gps antenna mounting
1
6
Alarm Connector Kit
contains:
2 x 2 alarm connectors
1 x 12 way alarm connector
3 strain relief cable ties
1
7
Cable Gland Kit
contains:
5 off cable glands plain-single Ø7-4mm
5 off emc cable glands- Ø8-4mm
2 x dual inserts 5mm diam cable
2 x dual inserts 6mm diam cable
1
8
Service Access Cover – Tool
1
Figure 6-1 : Unpacking Sequence
Node B Unit
Mounting
Bracket
KITS
1. Mounting Kit
2. GPS Kit
3. Alarm Kit
4. Gland Kit
5. Service AccessTool
Solar Shield