Node B Installation Guide

                                            

 

 

Version 5.0.0 

 

Page 1 of 15 

 

 
 
 
 
 
 
 

Node B V2  

 

Installation Guide 

 
 

 

 

Содержание Node B

Страница 1: ...Node B Installation Guide Version 5 0 0 Page 1 of 15 Node B V2 Installation Guide ...

Страница 2: ... Inc is strictly forbidden Trademarks used in this text the IPWireless logo icon and IPWireless Broadband Modeem are trademarks of IPWireless Inc Microsoft Windows and Windows NT are registered trademarks of Microsoft Corporation Other trademarks and trade names may be used in this document to refer to either the entities claiming the marks and names or their products IPWireless Inc disclaims any ...

Страница 3: ...ng Bracket Error Bookmark not defined Step 7 Ground Installation Error Bookmark not defined Step 8 Service Cover Access Error Bookmark not defined Step 9 DC Power Connection Error Bookmark not defined Step 10 Backhaul Connections Iub to INC Error Bookmark not defined Step 12 Antenna Cabling Installation Error Bookmark not defined Step 13 Alarm Connections Error Bookmark not defined Step 14 GPS Ins...

Страница 4: ... not defined Figure 6 8 Node B Rack Mounted Error Bookmark not defined Figure 6 9 Flexible Conduit Error Bookmark not defined Figure 6 10 Node B onto Mounting Bracket Error Bookmark not defined Figure 6 11 Earth Connection Error Bookmark not defined Figure 6 12 Service Access Error Bookmark not defined Figure 6 13 Service Area Description Error Bookmark not defined Figure 6 14 Power Connections Er...

Страница 5: ...Node B Installation Guide Version 5 0 0 Page 5 of 15 1 Release Version Date Version Author Reason For Change Issue 8 th April 2003 5 0 0 L Mujegu Initial Version ...

Страница 6: ...atches and other jewellery before working with this type of equipment Batteries Certain installation of this equipment require working with lead acid batteries batteries present chemical electric and gaseous hazards Batteries are not supplied by IPWireless for the Node B equipment although UPS systems may be coupled with the device in order to provide back up power in case of power outages Physica...

Страница 7: ...e required The Node B is controlled by an INC Integrated network Controller Generally co located at the site in a separate cabinet The Node B supports both 768 mega chips 10MHz and 385 mega chips 5MHz without any hardware modification Scope This document covers the physical installation and mountint of the NodeB using bracketry supplied It does not detail custom or specialised installations or app...

Страница 8: ...asurements with Solar Shield attached 566 H x 380 W x 294 D mm 22 5 H x 15 W x 11 5 D inch Node B Weight 25Kgs 55 lbs Node B Weight with solar shield and mounting Bracket 30Kgs 66 lbs Power Consumption 200 Watts max Input Power 48 V DC Input Range 36V to 72V DC Ambient Operational Temp Range 40ºC to 55ºC Cooling Passive Operating Frequencies MMDS 2500 MHz 2700 MHz UMTS 1900MHz 2100MHz Node B witho...

Страница 9: ...1905 1910 MHz Model GN 1910 1915 MHz Model GP 1915 1920 MHz Model GQ 2053 2082 MHz Model HV 2010 2015 MHz Model JG 2500 2686 MHz Model HZ Figure 5 2 General Description 10 406mm 406mm 202mm 560mm 560mm ACCESS COVER CABLE GLANDS SOLAR SHIELD MOUNTING BRACKET NODE B UNIT EXTERNAL STATUS LEDS RF ANTENNA CONNECTIONS GPS ANTENNA CONNECTIONS ...

Страница 10: ... installation is complete For Installation Check Card please see Appendix A at the back of this manual 1 Review site construction drawings to determine if site was constructed according to the drawings 2 Review drawings and actual installation to determine location of Node B installation 3 Check availability of electrical grounding and antenna connections 4 Complete site survey 5 Check structural ...

Страница 11: ...the packing Table 6 1 Packing List Description Qty 1 Node B Unit 1 2 Node B Mounting Bracket 1 3 Solar Shield Assembly 1 4 Unit Mounting Bracket Fixings Kit contains 4 x M8 bolts 1 5 GPS Antenna Kit incl Mounting contains 1 x gps antenna 1 x gps antenna mounting 1 6 Alarm Connector Kit contains 2 x 2 alarm connectors 1 x 12 way alarm connector 3 strain relief cable ties 1 7 Cable Gland Kit contain...

Страница 12: ... Handheld GPS with signal indicator Test for GPS signal at site location Table 6 3 Materials Required Material Description Armoured conduit UL 1211 Ducting UL rated 12x18mm Diameter Cable conduit attached to cable glands CAT5 4 pair double screened cable recommended Alcatel LANmark 5 F 2 TP or equivalent IUB LMT T1 E1 Cable RJ45 Connectors IUB LMT T1 E1 Connections CSA 7mm2 or Ø3mm or 9AWG Max for...

Страница 13: ...rthing has been done with certification for safety compliance issued as required by local regulations It is also strongly recommended that all VSWR plots of the feeder antenna installations should be available for inspection Positioning the Node B Depending on the flatness of the wall the bracket can either be mounting directly to the wall or can be mounted offset from the wall using Unistrut Sele...

Страница 14: ... GPS remote antenna i e a Southern Exposure is required for outside installations Northern Hemisphere a GPS repeater may be necessary in areas where the active GPS antenna cannot reach Ø Depending on the installation it may be required to fit the cable conduit to the cable glands prior to mounting Node B to the bracket Ø There should be a minimum clearance of 1m above and below the Node B Ø Ensure...

Страница 15: ...in all three instances The securing of the Node B to the mounting bracket is the same for the three mounts and shall be described in step 10 Mounting Bracket The figure below illustrates the key features of the mounting bracket Figure 6 3 Mounting Bracket a wall mounting fixing holes keyslots various b unit mounting keyslots to mount nodeb to bracket 4off c fixing points to secure Node B to bracke...