
Product Description of BRT-311
Page 3 of 7
Shenzhen Asia Bright Industry co., Ltd., Building 10, Asia Industrial Park, Gangtou, Bantian, Shenzhen, China.
© 2015 All rights reserved. Subject to change without notices.
1.
Installation using a holder
As shown in Fig. 4, a holder is attached to the ceiling using screws first. Then, the PIR remote
control can be easily snapped into the holder.
The holder is specially designed for BRT-311 PIR remote control. Please talk to our sales
representative when placing orders.
Fig. 4
Installation with a Holder
2.
Installation without a holder
As shown in Fig. 5, without a holder, an opening in the ceiling needs to be made first. There are
four steps:
Step one:
Open a hole of 68mm in diameter in the ceiling;
(Attach the electrical wires as shown in the Wiring Diagram Fig. 3).
Step two:
Open the two flexible clamps on the side surface of the remote control;