1.  Determination of installation position

in A . in S 

installation instruction

2.  Provide a 30cm deep drainage with gravel. Position the 

luminaire loose into the gravel bed.

  Adjust the upper edge of the luminaire flush with FFL.
  Connection of the supply cable may not be made  

directly close to the luminaire housing, but in a distance 
of at least 1 m.

  The enclosed cable conduit has to be pushed on the 

connection cable up to aquastop to protect it. 

  Provide electrical connection.
  Fill in installation position with soil or gravel. 

3.  Optionally the distribution box (item no. 55380) can be 

used to connect up to 6 luminaires in the ground to the 
supply line installed by the customer. After installation, 
all electric cables are sealed in the distribution box with 
the supplied cast resin.