7.3 RS485-DRM ports
Table 7-3 RS485-DRM Pins on inverter instruction
Pin on inverter
Colour
Definition
1 Red
RefGen
2 Yellow
Com/DRM0
3 White
DRM1/5
4 Black
DRM2/6
5 Green
DRM3/7
6 Blue
DRM4/8
Figure 7.5 RS485-DRM pin on inverter Figure 7.6 Connection cable
RS485-DRM connection steps:
(1) Weld communication cables to the RS485-DRM terminals of the inverter as figure 7.6 shows;
Ensure the cable corresponds to the pin as table 7-3 shows and the welding is tight enough.
According to Table 7-3, connect the communication connector pinout and the user's device, make
sure the connection is correct.
Содержание iMars BG12KTR
Страница 1: ...Operation Manual iMars SJE UJFE 4PMBS OWFSUFS INVT Solar Technology Shenzhen Co Ltd...
Страница 2: ......
Страница 67: ......
Страница 68: ...201807 V1 1...