Freezing point
℃
-1.7 -3.3 -5.3 -7.2 -9.7 -12.8 -16.4 -20.9 -26.1 -32 -39.7 -50
The processes for filling liquid:
1. Inspect the pipes which have been connected to make sure that the check valve, gate valve, filter and
circulation pump are connected correctly, and that the pipes and connectors have been tightened while
the pipes have been fixed firmly (for the pipe connection, see the figure below);
2. Pressurization test
(
Pressurizing with water
)
:
(Principle schematic drawing of the heat collecting system)
5
Содержание ISP 2.0
Страница 5: ...4 CollectorDrowning and dimensions mm 3...
Страница 12: ...F...
Страница 16: ...1 Collector 2 Collector fixing hook 3 Channel steel 4 Rubber pad J...
Страница 17: ...2 Color steel roof K...
Страница 21: ...3 How to mount the collector 1 Collector 2 Collector fixing hook 3 Channel steel 4 Rubber pad O...
Страница 24: ...1 When the collector is mounted to the external wall vertically R...
Страница 26: ...2 When the collector is mounted to the external wall not vertically T...
Страница 27: ...1 Support frame 2 Front support 3 Support connecting rod 4 Expansion bolt 5 Bolt 6 Collector 7 Bolt U...
Страница 29: ...Pipeline connection 1 Connection proposal for solar system with 1 panel W...
Страница 36: ......