Optidrive P2 Elevator User Guide V2.30
Start up and Commissioning
www.InvertekDrives.com
10.
Start up and Commissioning
This chapter details the setup procedure of the drive, each section should be followed in accordance with the given instructions in order to
achieve the required performance of the Elevator.
Commissioning flow diagram.
Mechanically install the drive
“Section 5”
Motor Control Modes
“Section 10.1”
Make all the necessary
wiring connections
“Section 11.1”
Gearless (Permanent Magnet)
Motor
Make all the necessary
wiring connections
“Section 12.1”
Geared (Induction)
Motor
Perform Pre-Power checks
“Section 11.2”
Perform Pre-Power checks
Apply Mains Power
Apply Mains Power
Enter Motor Nameplate
data
“Section 11.4”
Enter Motor Nameplate
data
“Section 12.4”
Perform motor auto--tune
“Section 11.5”
Perform motor auto--tune
“Section 12.5”
Encoder setup & Direction
checks
“Section 11.6”
Encoder setup & Direction
checks
“Section 12.6”
Adjust for Optimal Comfort
“Section 13”
Encoder offset measurement
“Section 12.7”
Adjust for Optimal Comfort
“Section 13”