5
USER AND SAFETY INSTRUCTIONS
5
iV-Smart+ ventilation unit | Installation instructions
1.2 Safety instructions
The installation instructions are part of your iV-Smart+ ventilation unit and must be available at all
times (see www.inventer.de/downloads). When handing the system to a third party, the informa-
tion regarding access to the installation instructions must be handed over also.
Before performing any work on the unit/system, read the installation instructions carefully and
observe all notices that refer to the installation process in this section.
Also note the safety instructions that precede the described handling instructions. Non-obser-
vance of safety instructions could result in injury and/or property damage.
These installation instructions only cover the standard variant (referred to as the "Standard
variant" in the following text) of the iV-Smart+ ventilation unit. Information on the variants can be
found in the separate installation instructions for the respective components.
Intended use
The ventilation unit is designed to ventilate dwellings and similar residential spaces. It is controlled
via an inVENTer system control unit (hereinafter referred to as the "controller").
General information
• Always observe the relevant standards, regulations and guidelines when installing the equip-
ment / system. In particular also applicable building regulations, fire safety regulations and
accident prevention regulations of the employers' liability insurance association.
• Use the unit/system exclusively for the applications that are described in this documentation
and only in conjunction with components that are recommended, authorised and described by
inVENTer GmbH in this documentation.
Changes or modifications to the unit/system are not permitted.
• Your ventilation system is exclusively designed for use in ambient temperatures between
-20 and 50°C.
• Trouble-free and safe operation of the unit / system depends on proper transportation, proper
storage and installation, as well as careful operation and cleaning / care.
Installation and assembly
•
CAUTION:
The system may only be installed by qualified personnel.
• Before starting work, you should have a project plan showing the number of ventilation units,
the location of the ventilation units, the ventilation principle (cross ventilation, single room venti-
lation, extract ventilation) and the associated controllers. The exact positioning of the individual
units and control units must be checked at the installation site and, if necessary, adapted to the
local conditions with the involvement of the responsible planner or user. For optimum function-
ality, it is recommended to install the unit at an appropriate place in the upper wall area.
•
WARNING:
For joint operation with open-flue and balanced-flue fireplaces, safety measures
must be taken to prevent a negative pressure from developing in the building. The responsible
chimney sweep and/or building planner decides which measures need to be carried out.
•
NOTICE:
The ventilation unit is not suitable for drying out buildings.
Do not put it into operation until the construction work has been completed.
•
NOTICE:
Contamination of components, e.g. by plaster residue, will damage the components!
Seal the ventilation unit/air outlets of the ventilation unit so they are dust-tight throughout the
construction work. Do not remove any thread locks present until final assembly.