![Invacare Matrx MX1 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/invacare/matrx-mx1/matrx-mx1_user-manual_2082513016.webp)
4 DUAL MOUNT
16
4.6
Installing the Band Clamps
1.
Install the two band clamps
A
onto the back canes
B
of the
wheelchair.
4.7
Installing the Back
1.
Align and insert the tabs
A
on the band clamp
B
with the slots
C
in the clamp body
D
.
2.
Ensure the band clamp is fully inserted into the clamp body.
3.
Loosen the compression bar hardware
E
, so the clamp body rests
flush against the back cane.
4.
Insert the two locking pins
F
into the clamp body to lock the band
clamp in position.
5.
Ensure both locking pins are fully inserted.
\
6.
Tighten the compression bar hardware
E
to hold the locking pins
F
in place. Do not fully tighten the hardware at this time.
Allow the band clamps to rest on the rigidizer bar
C
.
A
C
B
A
B
C
D
The pins should slide into position with little effort. If the
pins are difficult to insert, verify that the band clamp is
properly centered and fully seated inside the slots
G
of
the clamp body.
E
F
G
E
F