3. Switch ON the pump by pressing “I” on the switch located on top of pump. See Fig
(3)
.
4. Turn valve control dial fully clockwise until it stops. The airbed is now inflating. See Fig
(4)
.
5. When the airbed is fully inflated
,
turn the valve control dial back (counterclockwise) to the
center position closing the inflation valve. Then turn off the pump by pressing “O” on the
switch. See Fig
(5)
.
NOTE:
Turning the valve control dial from the center/closed position will open the valve
inside the pump and allow air to escape, even if pump is not running. Operate the valve
control dial when inflating or deflating the airbed, or for firmness adjustment (see step #6).
Never disconnect the power line cord from the electrical outlet while the pump is operating.
Switch off the pump first before disconnecting the power line cord.
INFlATION
1. Open line cord compartment cover and remove line cord. Do not yank on the cord.
See Fig
(1)
.
2. Plug in the AC line cord into an AC electrical outlet. See Fig
(2)
.
6. If the airbed feels too firm, release some air by simply turning the valve control dial
gradually in either direction to allow air to escape until desired firmness is achieved, then
turn the valve control dial back to the center/closed position. If the bed feels too soft,
repeat steps #3 to #6 as necessary.